India · Reserve Bank of India Services Board · unverified source
RBI Grade B (DSIM) - Department of Statistics and Information Management is a government recruitment exam run by Reserve Bank of India Services Board, for candidates in India.
Phase I objective screening, Phase II papers in statistics and English, and an interview (reported).
We have not been able to confirm these details against the exam body's own specification, so fees, dates and pass marks are left out on purpose.
Check the current format, eligibility, fees and dates on the official site: opportunities.rbi.org.in.
RBI recruits statisticians for its surveys and econometric work through this stream.
Our reading of the syllabus, from the questions we have written to this exam; the exam body's own weighting, where published, is under Format above.
Start here: read these subjects' manuals first and work their questions until the reasoning is automatic.
One pass per subject, then mixed sets across them.
Definitions, classifications and standard figures; quick to revise, easy marks to lose.
Leave untimed time for these and read every explanation, including for the options you rejected.
Official source: opportunities.rbi.org.in
Original questions written to this exam's published syllabus and pattern. Not past papers.
1. Plant height has mean 50 cm and standard deviation 4 cm; the distribution is unknown. What does Chebyshev's inequality give as an upper bound for P(|X − 50| ≥ 10)?
D. 0.16
P(|X − μ| ≥ c) ≤ σ²/c² = 16/100 = 0.16. 0.40 uses σ/c without squaring; 0.84 is the lower bound for the complement; 0.0124 is the exact value only if X were normal.
Probability Theory · Inequalities: Markov, Chebyshev, Jensen and Cauchy-Schwarz
2. How is the Bayes risk r(π, δ) of a decision rule defined?
C. R(θ, δ) averaged over the prior
r(π, δ) = ∫ R(θ, δ)π(θ)dθ. The maximum risk defines the minimax criterion; posterior expected loss is minimised pointwise to find the Bayes rule.
Bayesian Inference · Decision theory: loss functions and Bayes risk
3. A model of monthly milk procurement is Y(t) = b0 + b1 X(t) + n(t), where X(t) is a fodder-price index and n(t) follows an ARIMA(1,1,0) process. How is the model estimated correctly?
C. Difference Y and X together and fit the regression with AR(1) errors
If the error needs differencing, all variables in the regression are differenced, then the regression is fitted with ARMA (here AR(1)) errors. Differencing Y only changes the meaning of b1; OLS in levels risks spurious regression.
Time Series Analysis · Seasonal ARIMA and ARIMAX with weather covariates
4. In an event study, coefficients for the three years before a scheme are large and significant. What does this suggest?
A. Pre-trends or anticipation
Leads should be near zero under parallel trends; significant leads cast doubt on the design.
Causal Inference, Panel Data & Efficiency Analysis · Difference-in-differences and event studies
5. In a causal graph, both adopting a technology and high yield cause a farm to be selected for a media award. Analysing only award-winning farms will:
B. It conditions on a collider
The award is a common effect (collider) of adoption and yield; conditioning on it induces an association between them even if none exists in the population.
Causal Inference, Panel Data & Efficiency Analysis · Potential outcomes and the identification problem
6. In placebo tests, the treated state's post/pre RMSPE ratio is the largest among 20 states. What is the permutation p-value?
B. 0.05
Ranked first of 20 units, the p-value is 1/20 = 0.05.
Causal Inference, Panel Data & Efficiency Analysis · Synthetic control
7. With three instruments for one endogenous variable, the Hansen J test does not reject. What can be concluded?
B. They agree; validity is unproven
Overidentification tests check whether instruments give similar estimates, so they are mutually consistent but not proven valid; if all are invalid in the same way, the test cannot detect it.
Causal Inference, Panel Data & Efficiency Analysis · Instrumental variables and local average treatment effects
8. For the MA(1) process Y(t) = e(t) + 0.5 e(t-1), what is the lag-1 autocorrelation?
C. 0.40
rho(1) = theta/(1 + theta^2) = 0.5/1.25 = 0.40. 0.50 is theta itself; 0.25 is theta squared; 0.67 is 0.5/0.75.
Time Series Analysis · AR, MA and ARMA processes
Last updated · How Laisha writes and checks its pages · Report a mistake
US$10 a month · one price worldwide · cancel any time
| Free | Smarter | |
|---|---|---|
| Grow guides, pest pages, articles | Read all | Read all |
| Ask Laisha | 5 a day | Up to 1,000 a month |
| Exam practice | The sample on each page | Every question, timed papers |
| Crop calendar and pest alerts | — | For your own fields |
| Calculators and tools | — | All |
| Uploads and reports | — | 100 a month, real files |
An AI operating system for agriculture: free guides, manuals and tools written for every country.