What AMDAL compiler competency certification is

In Indonesia, the people who prepare an AMDAL (Analisis Mengenai Dampak Lingkungan Hidup, the environmental impact assessment) must hold an AMDAL competency certificate. The rules are set by Minister of Environment and Forestry Regulation No. 18 of 2021 on AMDAL competency certification, AMDAL service-provider institutions and environmental feasibility testing, issued under Government Regulation No. 22 of 2021. Certification has three parts: training by an accredited AMDAL training institution (LPK Amdal), a competency test by an AMDAL competency certification institution (LSK Amdal) designated by the Minister, and issue of the certificate at one of two qualifications: team leader (ketua tim, KTPA) or team member (anggota tim, ATPA). The environment ministry's PPSDM portal lists the accredited certification bodies and a public register of certified AMDAL compilers with their certificate numbers and validity dates.

Who is eligible

How to register

  1. Complete AMDAL compiler training at an accredited LPK Amdal and obtain the certificate of completion.
  2. Apply to a designated LSK Amdal for the competency test at the qualification you meet (team member, or team leader after at least five AMDAL studies as a team member).
  3. Sit the competency test, assessed against the AMDAL compiler competency standard, which is based on the Indonesian national work competency standard (SKKNI) for AMDAL compilers.
  4. The LSK declares you competent or not yet competent; if competent, the head of the LSK issues an AMDAL Compiler Competency Certificate at the qualification tested.
  5. Once certified, report your AMDAL work at least once a year and maintain competence at least once a year through technical guidance, workshops, seminars or similar activities run by a designated LSK.

Format

A competency test (uji kompetensi): a technical and non-technical assessment through the collection of relevant evidence to decide whether a person is competent or not yet competent in AMDAL, against the AMDAL compiler competency standard set out in Annex I of the regulation. The LSK evaluates each certificate holder at least once every three years, and may require a repeat test if a holder does not maintain competence for two consecutive years.

From the exam body's own pages, checked 2026-11-10.

Sections

Fees: Fees for training and competency testing are set by the training and certification institutions and were not checked.

How it differs from similar exams

The AMDAL certificate is a competency certification based on training, evidence and experience, with a team-leader level above the team-member level, rather than a single written professional exam such as China's EIA Engineer exam. Examiners of AMDAL compilers (Penguji Penyusun Amdal) form a separate, more senior role.

How to prepare for AMDAL compiler competency certification

Official sources: Permen LHK No. 18 of 2021 (JDIH BPK) · Accredited environmental LSK and register of AMDAL compilers (PPSDM KemenLH). Checked 2026-11-10.

Not confirmed from an official source, so not stated here: Certificate validity period under the current regulation (the public register shows validity dates per certificate).; Whether later regulations have amended Permen LHK 18/2021..

2 practice questions, worked

Original questions written to this exam's published syllabus and pattern. Not past papers.

1. Which item belongs in an EIA's terms of reference?

  1. The amount of compensation each villager will finally receive after construction is complete
  2. The proponent's annual profit forecast and expected dividend to shareholders
  3. Baseline parameters, sampling seasons and frequency, and prediction methods to be used
  4. The name of the judge who will hear any appeal against the clearance
Answer and working

C. Baseline parameters, sampling seasons and frequency, and prediction methods to be used

ToR specify the project description, study area, baseline parameters and seasons, prediction methods, significance criteria, mitigation, EMP, consultation and report contents. Final compensation, profits and judges are not ToR items.

Environmental Impact Assessment & Strategic Environmental Assessment · Scoping and terms of reference

2. Which practice best improves the inclusiveness of a public hearing for a rural irrigation project?

  1. Holding a single meeting in the state capital in English on a weekday morning
  2. Holding meetings in villages in local languages, with separate sessions for women
  3. Publishing the full technical report online only, with no summary
  4. Limiting speakers to those who submitted written comments in advance
Answer and working

B. Holding meetings in villages in local languages, with separate sessions for women

Accessible venues, timing, language, non-technical summaries and separate sessions for women and marginal groups widen participation. A distant English-only meeting, online-only technical reports and speaker restrictions exclude people.

Environmental Impact Assessment & Strategic Environmental Assessment · Public consultation and hearings

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock all 2 questions — AMDAL (EIA) compiler competency certification

US$10 a month · one price worldwide · cancel any time

  • Every practice question for this course, with explanations
  • Timed papers for the exams this course leads to
  • Ask Laisha to explain any topic — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.