LAISHA
Open Laisha

NABARD Assistant Manager Grade A Business Statistics & Quantitative Methods: practice questions

NABARD Assistant Manager Grade A (RDBS) · India · National Bank for Agriculture and Rural Development

Original practice questions written to the published syllabus · not past papers
7worked here, free
18written to this exam in this subject
10syllabus units

About NABARD Assistant Manager Grade A

NABARD Assistant Manager Grade A (RDBS) is a government recruitment exam run by National Bank for Agriculture and Rural Development, for candidates in India. Phase I: 200 questions / 200 marks / 120 minutes, -1/4. Phase II: Paper I General English, descriptive, 100 marks / 90 minutes; Paper II (generalist) ESI + ARD, 30 objective questions / 50 marks / 30 minutes plus descriptive (attempt 4 of 6: 2 x 15 + 2 x 10) / 50 marks / 90 minutes. Mandatory psychometric test. Interview 50.

Source: nabard.org.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Business Statistics & Quantitative Methods in NABARD Assistant Manager Grade A

The statistics every later subject leans on: describing data, probability, sampling, testing and relating variables, plus the mathematics economists use.

Our 18 NABARD Assistant Manager Grade A questions in this subject: 11 easy, 5 medium, 2 hard, across 10 units.

7 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 7 were written to NABARD Assistant Manager Grade A and are not shown on any other exam's page.

Question 1 · easy

Daily wholesale prices of tomatoes over a fortnight ranged from a low of 12 to a high of 36 currency units per kg. What is the coefficient of range?

  1. 24
  2. 0.50
  3. 0.67
  4. 2.00
Answer and working

B. 0.50

Coefficient of range = (L - S)/(L + S) = (36 - 12)/(36 + 12) = 24/48 = 0.50. 24 is the range itself; 0.67 is 24/36 (dividing by the largest value); 2.00 is 24/12.

Question 2 · medium

A farm has three independent irrigation pumps, each with probability 0.1 of breaking down on a given day. What is the probability that at least one breaks down that day?

  1. 0.271
  2. 0.300
  3. 0.001
  4. 0.729
Answer and working

A. 0.271

P(at least one) = 1 - P(none) = 1 - 0.9^3 = 1 - 0.729 = 0.271. Adding 0.1 three times (0.300) double-counts joint failures; 0.001 is P(all three); 0.729 is P(none).

Question 3 · hard

A cold store's compressor breaks down on average 3 times a year, following a Poisson distribution. What is the probability of at most one breakdown next year? (e^-3 = 0.0498)

  1. 0.0498
  2. 0.1494
  3. 0.1991
  4. 0.8009
Answer and working

C. 0.1991

P(0) + P(1) = e^-3 (1 + 3) = 0.0498 x 4 = 0.1991. 0.0498 is P(0) alone; 0.1494 is P(1) alone; 0.8009 is P(2 or more).

Question 4 · easy

A cooperative has a list of 1,200 member farmers and wants a systematic sample of 60. What is the sampling interval?

  1. 20
  2. 60
  3. 5
  4. 0.05
Answer and working

A. 20

k = N/n = 1,200/60 = 20: pick a random start between 1 and 20, then every 20th farmer. 0.05 is the sampling fraction n/N, not the interval. 5 is the sampling fraction written as a percentage.

Question 5 · hard

An agency claims 60 per cent of farmers use soil-health recommendations. A survey of 200 farmers finds 132 users. Test whether use is higher than claimed (one-tailed 5 per cent critical z = 1.645).

  1. z = 1.73; not significant
  2. z = 1.73; use is significantly higher
  3. z = 0.06; not significant
  4. z = 1.79; not significant
Answer and working

B. z = 1.73; use is significantly higher

Sample p = 132/200 = 0.66. Under H0 the SE uses P0: sqrt(0.6 x 0.4/200) = 0.0346. z = 0.06/0.0346 = 1.73 > 1.645, so reject H0. 0.06 is the difference, not a z value; with a two-tailed test (1.96) the result would not be significant, which is why the direction must be set in advance.

Question 6 · easy

A farm labourer's monthly wage is 30,000 currency units. The relevant consumer price index is 150 (base = 100). What is the real wage in base-period rupees?

  1. 20,000 currency units
  2. 45,000 currency units
  3. 30,000 currency units
  4. 15,000 currency units
Answer and working

A. 20,000 currency units

Real wage = nominal/price index x 100 = 30,000/150 x 100 = 20,000. 45,000 multiplies by the index instead of dividing. 15,000 deducts the full 50 per cent rise from 30,000.

Question 7 · easy

Wholesale onion prices fall every year just after the main harvest and rise before the next one. Which component of the time series is this?

  1. Long-term secular trend
  2. Seasonal variation
  3. Business-cycle variation
  4. Irregular variation
Answer and working

B. Seasonal variation

A regular pattern repeated within each year is seasonal. Trend is the long-run direction; cycles last more than a year and are irregular in length; irregular variation is random.

A study plan for Business Statistics & Quantitative Methods in NABARD Assistant Manager Grade A

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (56% of the 18 questions): Measures of central tendency (3, 17%); Probability distributions (3, 17%); Index numbers (2, 11%); Probability (2, 11%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Sampling techniques (2, 11%); Time series (2, 11%); Correlation (1, 6%); Measures of dispersion (1, 6%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Regression (1, 6%); Tests of significance (1, 6%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Tests of significance (1 hard of 1), Probability distributions (1 hard of 3).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Time series (2 easy of 2); Correlation (1 easy of 1).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — NABARD Assistant Manager Grade A Business Statistics & Quantitative Methods

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.