UGC-NET Production & Operations Management: practice questions

UGC-NET (June 2025) · India · National Testing Agency

Original practice questions written to the published syllabus · not past papers
10worked here, free
124written to this exam in this subject
16syllabus units

About UGC-NET

UGC-NET (June 2025) is a PhD, fellowship and lectureship exam run by National Testing Agency, for candidates in India. CBT (since Dec 2018). Paper I 50 questions / 100 marks; Paper II 100 questions / 200 marks; 180 minutes total; +2, no negative marking.

Source: ugcnet.nta.ac.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Production & Operations Management in UGC-NET

Production and operations management at MBA level: process-product matrix, capacity measures, layout, aggregate planning, scheduling rules, work study, inventory classification, MRP and ERP, JIT and lean, TQM thinkers, SPC and acceptance sampling, ISO standards, BPR, value engineering and maintenance. Mostly one-step conceptual and matching questions with occasional short numericals.

Designing and running production: location, layout, planning, inventory, quality and productivity, applied to processing plants and agribusiness operations.

Our 124 UGC-NET questions in this subject: 33 easy, 68 medium, 23 hard, across 16 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to UGC-NET and are not shown on any other exam's page.

Question 1 · hard

A cooperative dairy replaces manual pouch filling with automatic fillers. Litres per labour-hour rise 40% but capital charges rise sharply. Which statement is correct?

  1. Overall productivity must have risen by the same 40%, because labour productivity is the only measure that counts
  2. Productivity cannot be measured when capital changes
  3. Labour productivity rose, but only a multifactor measure shows whether overall productivity rose
  4. Capital productivity must also have risen because output per worker rose
Answer and working

C. Labour productivity rose, but only a multifactor measure shows whether overall productivity rose

A partial measure (labour productivity) ignores the extra capital used. Multifactor or total productivity, with all inputs in money terms, shows whether the trade of labour for capital raised efficiency overall. Capital productivity may well fall.

Question 2 · medium

Which forecasting method gathers anonymous opinions from a panel of experts in several rounds, with feedback, until views converge?

  1. Delphi method
  2. Jury of executive opinion
  3. Sales-force composite
  4. Exponential smoothing
Answer and working

A. Delphi method

The Delphi method uses anonymity and iterated feedback to avoid dominance by strong personalities. Jury of executive opinion meets face to face; sales-force composite adds up salespeople's estimates; exponential smoothing is a time-series method.

Question 3 · hard

A pilot work-sampling study finds a forklift idle about 25% of the time. How many random observations are needed to estimate idle time within plus or minus 5 percentage points at 95% confidence (z = 1.96)?

  1. 4,610
  2. 289
  3. 147
  4. 385
Answer and working

B. 289

n = z^2 p(1-p)/e^2 = 1.96^2 x 0.25 x 0.75/0.05^2 = 288.1, rounded up to 289. Reading 5% as relative to p (e = 0.0125) gives about 4,610; forgetting to square z gives 147. 385 uses the conservative p = 0.5 instead of the pilot estimate of 0.25.

Question 4 · easy

On a flow process chart using ASME symbols, what does a large arrow represent?

  1. Transport
  2. Operation
  3. Storage
  4. Inspection
Answer and working

A. Transport

ASME symbols: operation is a circle, inspection a square, transport an arrow, delay a D shape, storage a triangle.

Question 5 · medium

What is the correct order of the basic steps of method study?

  1. Record, select, develop, examine, maintain, install
  2. Select, record, examine, develop, install, maintain
  3. Select, examine, record, install, develop, maintain
  4. Examine, select, record, develop, maintain, install
Answer and working

B. Select, record, examine, develop, install, maintain

The ILO procedure is select the job, record the present method, examine it critically, develop a better method, install (after evaluating and defining it), and maintain it.

Question 6 · hard

A juice carton contains 12 bottles, and each bottle takes one cap. The MPS calls for 200 cartons. There are 400 filled bottles and 300 caps on hand and no other stock. Using lot-for-lot, how many caps must be ordered?

  1. 1,700
  2. 2,100
  3. 2,400
  4. 2,000
Answer and working

A. 1,700

Gross bottles = 200 x 12 = 2,400; net bottles = 2,400 - 400 = 2,000. Caps are needed only for bottles to be made: gross caps 2,000, net caps 2,000 - 300 = 1,700. Exploding from gross bottles (2,100) skips netting at the bottle level, the classic MRP error.

Question 7 · easy

A flour mill's cost of goods sold is 120,000,000 currency units a year and its average inventory is 30,000,000. What are inventory turnover and days of inventory (365-day year)?

  1. 4 times; about 91 days
  2. 0.25 times; about 365 days
  3. 4 times; about 1,460 days
  4. 4 times; about 30 days
Answer and working

A. 4 times; about 91 days

Turnover = COGS / average inventory = 12/3 = 4. Days of inventory = 365/4 = 91.25, about 91 days. Inverting the ratio or multiplying by 365 are the slips.

Question 8 · medium

A rice mill buys most of its year's paddy in the three months after harvest. In terms of inventory function, this stock is mainly:

  1. Cycle stock
  2. Anticipation stock
  3. Pipeline stock
  4. Decoupling stock
Answer and working

B. Anticipation stock

Anticipation stock is built ahead of need because supply or demand is seasonal. Cycle stock results from lot sizes; pipeline stock is in transit; decoupling stock separates stages.

Question 9 · easy

The ISI mark on a product in India indicates certification by:

  1. Directorate of Marketing and Inspection
  2. FSSAI
  3. The International Organization for Standardization
  4. Bureau of Indian Standards
Answer and working

D. Bureau of Indian Standards

BIS runs product certification with the ISI mark (named after its predecessor, the Indian Standards Institution). AGMARK is from DMI; ISO does not certify products.

Question 10 · medium

ISO 22000 is an international standard for:

  1. Food safety management systems
  2. Quality management systems in general
  3. Environmental management systems
  4. Occupational health and safety
Answer and working

A. Food safety management systems

ISO 22000 combines interactive communication, system management, prerequisite programmes and HACCP principles. ISO 9001 is QMS, ISO 14001 EMS, ISO 45001 OH&S.

A study plan for Production & Operations Management in UGC-NET

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (47% of the 124 questions): TQM, statistical process control and acceptance sampling (16, 13%); Business process re-engineering, value engineering and lean (9, 7%); Master production schedule (9, 7%); Maintenance management (8, 6%); Standards: ISO, HACCP, national standards bodies and grade marks (8, 6%); Work study (8, 6%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Aggregate planning: level, chase and mixed (7, 6%); Facility location (7, 6%); Inventory management (7, 6%); JIT and Kanban (7, 6%); Materials management, MRP, MRP II and ERP (7, 6%); Plant layout (7, 6%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Productivity (7, 6%); Forecasting (6, 5%); Process types: job, batch and continuous (6, 5%); Process-product matrix (5, 4%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Process-product matrix (2 hard of 5), Aggregate planning: level, chase and mixed (2 hard of 7), TQM, statistical process control and acceptance sampling (4 hard of 16).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Productivity (3 easy of 7); Work study (3 easy of 8).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — UGC-NET Production & Operations Management

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.