Original practice questions written to the published syllabus · not past papersNDDB and dairy cooperative recruitment is a professional certification run by National Dairy Development Board; state cooperative milk federations, for candidates in India. NDDB's career page links to an external portal; no selection procedure was shown when read on 3 Oct 2026.
Official site: nddb.coop.
We have not been able to confirm these details against the exam body's own specification, so fees, dates and pass marks are left out on purpose. Check the current format, eligibility, fees and dates on the official site.
Planning a dairy plant from product mix to building: location, layout, equipment sizing, pressure vessels, costing and commissioning.
Our 29 NDDB and dairy cooperative recruitment questions in this subject: 4 easy, 12 medium, 13 hard, across 9 units.
Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.
These 10 were written to NDDB and dairy cooperative recruitment and are not shown on any other exam's page.
Two sites are scored on milk supply, water, effluent route and land cost with weights 0.4, 0.3, 0.2 and 0.1. Site X scores 8, 6, 7 and 5; site Y scores 6, 9, 6 and 8. Which site has the higher weighted score?
D. Site Y, with 7.1 against 6.9
X = 0.4×8 + 0.3×6 + 0.2×7 + 0.1×5 = 6.9; Y = 0.4×6 + 0.3×9 + 0.2×6 + 0.1×8 = 7.1, so Y is preferred. Reading the unweighted totals (26 and 29) ignores the weights the planners chose, and Y wins on those too.
Why should the first site plan for a new dairy plant reserve land beyond what the first phase needs?
A. Plants usually grow in stages, and early layouts can block later halls
Expansion with additional silos, a second processing hall or a drier is common, and a first-phase layout that occupies the wrong part of the site can force costly demolition or a second site. There is no universal empty-land rule, powder is never sun-dried, and insurance effects vary.
A plant must pasteurise 200,000 litres a day in 16 productive hours, and the designers add a 10 percent margin for growth. What pasteuriser capacity should be specified?
B. 13,750 litres per hour
Required rate = 200,000 ÷ 16 = 12,500 L/h; with a 10% margin, 12,500 × 1.1 = 13,750 L/h. 12,500 omits the margin; 8,333 divides by 24 hours instead of the productive hours; 11,250 subtracts the margin instead of adding it.
In the flush season a plant receives 300,000 litres a day and its liquid milk and fresh products need 180,000 litres. How much milk must the conversion section handle each day?
C. 120,000 litres a day
Surplus for conversion = 300,000 − 180,000 = 120,000 L/day. 180,000 is the fresh-product allocation; 480,000 adds instead of subtracting; 300,000 is the whole intake.
Why might the bottleneck of a dairy plant move between the lean and flush seasons?
A. The product mix changes, so different lines reach full capacity in different seasons
In the lean season most milk goes to liquid products, so that line limits; in the flush the surplus goes to the drier or butter line, which then limits. Rated capacities and silo volumes do not change with the season in the way the other options claim.
Which strategy raises annual capacity utilisation of a seasonal dairy plant without new equipment?
C. Price incentives that flatten milk intake across the year
Seasonal pricing that rewards lean-season milk narrows the gap between flush and lean intake, so equipment runs closer to capacity all year. A larger drier lowers utilisation further; cutting products or closing the section reduces use of the plant rather than raising it.
Why are ammonia refrigeration machinery rooms given separate ventilation, gas detection and separation from occupied areas?
C. Ammonia is toxic and a leak must be detected, vented and kept from workers
Ammonia is an efficient refrigerant but toxic, so machinery rooms have detection, emergency ventilation and separation. Ammonia vapour is lighter than air, and compressors are not silent.
Which document is submitted to a lender or board to obtain approval and finance for a dairy plant?
D. A detailed project report
The detailed project report sets out the market, procurement, technical design, costs, means of finance, projections, appraisal and risks. The other documents are operating records.
Which section of a detailed project report for a dairy plant states the expected seasonal milk intake and its price assumptions?
A. The milk procurement plan
The procurement plan describes the milk shed, collection system, expected flush and lean intake and procurement price assumptions, which drive capacity and profitability. The other sections describe staff, buildings and equipment.
A project network has two paths: A–B–D taking 4 + 6 + 5 weeks, and A–C–D taking 4 + 9 + 5 weeks. What is the critical path and its duration?
C. A–C–D, 18 weeks
Path durations are 15 weeks for A–B–D and 18 weeks for A–C–D; the longest path is critical, so the project takes 18 weeks. 13 weeks omits activity A; 24 weeks adds every activity as if all were in series.
This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.
Read the manual chapters for these first and do every worked question you can find on them.
Aim for one sitting per unit, then mixed questions across them.
Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.
Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.
Do these early in revision so they are fast on the day.
Last updated · How Laisha writes and checks its pages · Report a mistake
US$10 a month · one price worldwide · cancel any time
| Free | Smarter | |
|---|---|---|
| Grow guides, pest pages, articles | Read all | Read all |
| Ask Laisha | 5 a day | Up to 1,000 a month |
| Exam practice | The sample on each page | Every question, timed papers |
| Crop calendar and pest alerts | — | For your own fields |
| Calculators and tools | — | All |
| Uploads and reports | — | 100 a month, real files |
An AI operating system for agriculture: free guides, manuals and tools written for every country.