NDDB and dairy cooperative recruitment Dairy Plant Utilities & Energy Management: practice questions
NDDB and dairy cooperative recruitment · India · National Dairy Development Board; state cooperative milk federations
Original practice questions written to the published syllabus · not past papers
10worked here, free
19written to this exam in this subject
10syllabus units
About NDDB and dairy cooperative recruitment
NDDB and dairy cooperative recruitment is a professional certification run by National Dairy Development Board; state cooperative milk federations, for candidates in India. NDDB's career page links to an external portal; no selection procedure was shown when read on 3 Oct 2026.
We have not been able to confirm these details against the exam body's own specification, so fees, dates and pass marks are left out on purpose. Check the current format, eligibility, fees and dates on the official site.
Dairy Plant Utilities & Energy Management in NDDB and dairy cooperative recruitment
Steam, water, compressed air and electricity in the milk plant, and how to audit and cut energy and water use.
Our 19 NDDB and dairy cooperative recruitment questions in this subject: 13 easy, 6 medium, 0 hard, across 10 units.
10 practice questions, worked
Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.
These 10 were written to NDDB and dairy cooperative recruitment and are not shown on any other exam's page.
Question 1 · easy
An energy project costs 1,200,000 currency units and saves 400,000 a year. What is its simple payback?
A plant uses 600,000 L of water to process 200,000 L of milk. What is its specific water consumption?
4.0 L/L
3.0 L/L
0.33 L/L
1.5 L/L
Answer and working
B. 3.0 L/L
600,000 ÷ 200,000 = 3.0 litres of water per litre of milk.
Question 3 · medium
How is a sodium-form softener regenerated?
By back-washing alone
With brine
With chlorine gas
With hot caustic soda at CIP strength
Answer and working
B. With brine
Concentrated sodium chloride solution displaces hardness ions from the resin.
Question 4 · easy
Which compressor type is most common in medium and large dairies?
Rotary screw
Roots blower
Hand pump
Centrifugal blower
Answer and working
A. Rotary screw
Oil-injected or oil-free screw compressors dominate plant air duties.
Question 5 · easy
What is usually the biggest waste in a compressed air system?
Leaks
Ring mains
Receiver size
Filters
Answer and working
A. Leaks
Leaks can take a large share of output; survey and repair.
Question 6 · easy
What does a preliminary energy audit use?
A year of continuous logging
Only design drawings
Bills, existing data and a walk-through
Detailed submetering of every motor, pump and fan over weeks
Answer and working
C. Bills, existing data and a walk-through
A walk-through audit finds obvious savings and decides where detailed study is needed.
Question 7 · easy
In a pasteuriser, what is regeneration?
Hot milk heating cold incoming milk
Cooling by chilled water
Steam heating the holding tube
Re-pasteurising returned milk
Answer and working
A. Hot milk heating cold incoming milk
The regenerative section recovers most of the heat; see market-milk-processing.
Question 8 · easy
Which simple fitting saves hose water in washdown?
Shut-off nozzle
An open-ended pipe
A larger-bore hose
A hot-water mixer
Answer and working
A. Shut-off nozzle
Trigger nozzles stop flow when the hose is put down.
Question 9 · medium
Which is a routine daily boiler check?
Gauge glass blowdown and low-water cut-out test
Re-registration
Replacing safety valves
Hydraulic test
Answer and working
A. Gauge glass blowdown and low-water cut-out test
Daily checks confirm that level indication and low-water protection work.
Question 10 · easy
What must be done before opening a steam line for maintenance?
Open it hot to save time
Isolate, depressurise, drain and lock out under a permit
Only close the stop valve
Turn off lights
Answer and working
B. Isolate, depressurise, drain and lock out under a permit
Residual steam and condensate cause severe burns; permits enforce safe isolation.
A study plan for Dairy Plant Utilities & Energy Management in NDDB and dairy cooperative recruitment
This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.
First, the heavy units (53% of the 19 questions): Boiler and pressure-vessel safety rules (3, 16%); Compressed air systems (3, 16%); Boilers: types, fittings, mountings and efficiency (2, 11%); Electrical supply and power factor (2, 11%).
Read the manual chapters for these first and do every worked question you can find on them.
Then the middle band: Energy audits (2, 11%); Renewable energy in dairy plants: solar thermal, biogas (2, 11%); Water conservation and reuse (2, 11%); Heat recovery and cogeneration (1, 5%).
Aim for one sitting per unit, then mixed questions across them.
Then the lighter units: Steam distribution and condensate recovery (1, 5%); Water supply, treatment and quality for dairy use (1, 5%).
Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.
Bank the easy marks: Boilers: types, fittings, mountings and efficiency (2 easy of 2); Energy audits (2 easy of 2).
Do these early in revision so they are fast on the day.
Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.