LAISHA
Open Laisha

IIT JAM Statistical Quality Control & Reliability: practice questions

IIT JAM - Mathematical Statistics (MS) · India · IITs (JAM 2026 organised by IIT Bombay)

Original practice questions written to the published syllabus · not past papers
10worked here, free
36written to this exam in this subject
10syllabus units

About IIT JAM

IIT JAM - Mathematical Statistics (MS) is a postgraduate admission exam run by IITs (JAM 2026 organised by IIT Bombay), for candidates in India. Computer-based, 3 hours, 60 questions, 100 marks, English. Section A 30 MCQs (10 x 1 mark, 20 x 2 marks); Section B 10 MSQs (2 marks, no negative or partial marking); Section C 20 NAT (10 x 1, 10 x 2, no negative). MCQ wrong answers lose 1/3 or 2/3 mark.

Source: jam2026.iitb.ac.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Statistical Quality Control & Reliability in IIT JAM

Monitoring and accepting quality: Shewhart charts for variables and attributes, CUSUM and EWMA charts, process capability, acceptance sampling plans with their OC, AOQ and ATI curves, and reliability models, applied to seed testing, food processing and input quality. The Agricultural Engineering track covers control charts briefly; this is the full subject.

Our 36 IIT JAM questions in this subject: 6 easy, 25 medium, 5 hard, across 10 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to IIT JAM and are not shown on any other exam's page.

Question 1 · medium

What is the in-control average run length of a Shewhart chart with 3-sigma limits on a normal statistic?

  1. About 20 points
  2. About 100 points
  3. About 740 points
  4. About 370 points
Answer and working

D. About 370 points

ARL₀ = 1/0.0027 ≈ 370. 740 would correspond to a one-sided rule.

Question 2 · medium

In which phase are control limits estimated from historical data and assignable causes removed?

  1. Phase III
  2. Phase I
  3. Phase II
  4. The capability phase
Answer and working

B. Phase I

Phase I sets up the chart; Phase II monitors with fixed limits.

Question 3 · hard

An X̄ chart uses subgroups of 5 with 3-sigma limits. The mean shifts by one process standard deviation. What is the probability that the next point signals?

  1. 0.159
  2. 0.222
  3. 0.500
  4. 0.023
Answer and working

B. 0.222

The shift is δ√n = √5 = 2.236 standard errors: P(Z > 3 − 2.236) + P(Z < −3 − 2.236) = 0.222; ARL₁ ≈ 4.5. 0.159 ignores √n (a shift of one standard error).

Question 4 · medium

Subgroups of size 15 are taken. Which dispersion chart is preferred?

  1. The R chart
  2. The np chart
  3. The s chart
  4. The c chart
Answer and working

C. The s chart

For n above about 10 the standard deviation uses the data more efficiently than the range.

Question 5 · medium

What is the constant d₂ used in σ̂ = R̄/d₂?

  1. Expected range of n standard normals
  2. The standard deviation of the range
  3. The 3-sigma multiplier for X̄
  4. The ratio s/R
Answer and working

A. Expected range of n standard normals

E(R) = d₂σ for normal samples (2.326 for n = 5), so R̄/d₂ is unbiased for σ.

Question 6 · easy

An EWMA is zᵢ = λxᵢ + (1 − λ)zᵢ₋₁. Which λ makes it a Shewhart chart?

  1. λ = 0
  2. λ = 0.2
  3. λ = 0.5
  4. λ = 1
Answer and working

D. λ = 1

With λ = 1 only the current observation counts.

Question 7 · easy

Which statement about Cp and Cpk is always true?

  1. Cpk = Cp
  2. Cpk ≥ Cp
  3. Cpk ≤ Cp
  4. Cpk = 2Cp
Answer and working

C. Cpk ≤ Cp

Cpk equals Cp when centred and is smaller otherwise.

Question 8 · medium

Increasing n while keeping c/n fixed changes the OC curve how?

  1. It becomes steeper
  2. It becomes flatter
  3. It shifts left without changing shape
  4. It is unchanged
Answer and working

A. It becomes steeper

Larger samples discriminate better between good and bad lots, approaching the ideal step.

Question 9 · medium

Which assumption is critical for variables acceptance plans?

  1. Zero measurement error
  2. Normality of the characteristic
  3. Equal lot sizes
  4. A Poisson distribution of defects
Answer and working

B. Normality of the characteristic

The plan in effect estimates a tail probability from x̄ and σ, which is sensitive to non-normality.

Question 10 · medium

With σ unknown, how does a variables plan change?

  1. k is set to zero
  2. The plan becomes an attribute plan
  3. s replaces σ; n must rise
  4. σ is assumed equal to 1
Answer and working

C. s replaces σ; n must rise

Estimating σ adds uncertainty, so the s-method needs more items than the σ-method.

A study plan for Statistical Quality Control & Reliability in IIT JAM

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (58% of the 36 questions): CUSUM and EWMA charts (6, 17%); Acceptance sampling by variables (5, 14%); Control charts for variables: X-bar, R and s charts (5, 14%); Reliability: hazard rate, series and parallel systems, life testing (5, 14%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Six Sigma and design for quality (introduction) (4, 11%); Chance and assignable causes of variation (3, 8%); Process capability indices (3, 8%); Acceptance sampling by attributes: single, double and sequential plans (2, 6%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Control charts for attributes: p, np, c and u charts (2, 6%); OC, AOQ, AOQL, ASN and ATI curves (1, 3%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Acceptance sampling by attributes: single, double and sequential plans (1 hard of 2), Reliability: hazard rate, series and parallel systems, life testing (2 hard of 5), Six Sigma and design for quality (introduction) (1 hard of 4).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: CUSUM and EWMA charts (2 easy of 6); Process capability indices (1 easy of 3).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — IIT JAM Statistical Quality Control & Reliability

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.