ICAR AICE-JRF/SRF Dairy Refrigeration & Cold Chain: practice questions

ICAR AICE-JRF/SRF (PhD): Dairy Chemistry, Dairy Microbiology, Dairy Technology, Dairy Engineering · India · NTA for ICAR

Original practice questions written to the published syllabus · not past papers
10worked here, free
69written to this exam in this subject
12syllabus units

About ICAR AICE-JRF/SRF

ICAR AICE-JRF/SRF (PhD): Dairy Chemistry, Dairy Microbiology, Dairy Technology, Dairy Engineering is a PhD, fellowship and lectureship exam run by NTA for ICAR, for candidates in India.

Source: icar.org.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Dairy Refrigeration & Cold Chain in ICAR AICE-JRF/SRF

Unit 6: vapour compression components and types, theoretical and actual cycles, effect of operating parameters on COP, multi-pressure systems, vapour absorption, heat pumps, design of cold storage and air conditioning, cooling load calculation, psychrometry, equipment selection, insulation, vapour barriers and ice-bank tanks. Expect COP, TR, load and insulation calculations and system comparisons.

Refrigeration systems, ice-bank and chilled-water plants, cold stores and the cold chain from farm to retail. The agricultural engineering track (refrigeration-cold-chain) gives the general theory.

Our 69 ICAR AICE-JRF/SRF questions in this subject: 6 easy, 42 medium, 21 hard, across 12 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to ICAR AICE-JRF/SRF and are not shown on any other exam's page.

Question 1 · easy

How many tons of refrigeration is 100 kW (1 TR = 3.517 kW)?

  1. 100.0 TR
  2. 12.0 TR
  3. 28.4 TR
  4. 351.7 TR
Answer and working

C. 28.4 TR

100 ÷ 3.517 = 28.4 TR. 351.7 multiplies; 100 ignores the conversion; 12 confuses with 12,000 Btu/h.

Question 2 · medium

A bulk milk cooler must cool 2,060 kg of milk from 35 to 4 °C in 3 hours (cp 3.9 kJ/kg K). What average refrigeration capacity is needed, ignoring losses?

  1. 23.1 kW
  2. 69.2 kW
  3. 3.0 kW
  4. 26.0 kW
Answer and working

A. 23.1 kW

Q = 2,060 × 3.9 × 31 = 249,054 kJ over 10,800 s = 23.1 kW. The others multiply by 3, use 35 K instead of the 31 K drop, or use 4 K.

Question 3 · medium

HFOs such as R1234yf are attractive because they have:

  1. No flammability or pressure limits
  2. High ozone depletion potential
  3. Very low global warming potential
  4. The same GWP as R404A
Answer and working

C. Very low global warming potential

They are low-GWP synthetic alternatives.

Question 4 · hard

In two-stage ammonia systems, intercooling between stages:

  1. Adds water to the refrigerant
  2. Removes the need for a condenser
  3. Raises discharge temperature to aid oil return
  4. Cools intermediate gas, cutting work
Answer and working

D. Cools intermediate gas, cutting work

Cooling the intermediate gas reduces work and discharge temperature.

Question 5 · medium

Ice water from an ice bank is typically at about:

  1. 0.5–1 °C
  2. 10 °C
  3. 4–6 °C
  4. −10 °C
Answer and working

A. 0.5–1 °C

Melting ice holds the water near 0 °C.

Question 6 · easy

Pre-coolers using well water before the tank:

  1. Replace cleaning
  2. Reduce load
  3. Freeze the milk
  4. Increase energy use
Answer and working

B. Reduce load

Plate pre-coolers remove heat cheaply.

Question 7 · medium

High-hygiene filling rooms are supplied with filtered air at:

  1. 100% humidity
  2. Positive pressure
  3. Negative pressure
  4. Zero ventilation
Answer and working

B. Positive pressure

Air flows outwards to less clean areas.

Question 8 · medium

Why are freezer store floors heated or ventilated underneath?

  1. To warm products
  2. To dry the insulation
  3. To prevent frost heave
  4. To save refrigeration energy
Answer and working

C. To prevent frost heave

Frozen soil expands and cracks floors.

Question 9 · easy

Stock rotation in frozen stores usually follows:

  1. Last-in, first-out
  2. First-expiry, first-out
  3. Random picking
  4. Largest pack first
Answer and working

B. First-expiry, first-out

Oldest dates are dispatched first.

Question 10 · medium

The ATP Agreement concerns:

  1. Milk pricing
  2. ATP bioluminescence testing
  3. International carriage of perishable foods
  4. Ammonia plant safety
Answer and working

C. International carriage of perishable foods

It classifies and tests refrigerated vehicles.

A study plan for Dairy Refrigeration & Cold Chain in ICAR AICE-JRF/SRF

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (38% of the 69 questions): Vapour compression cycle and coefficient of performance (8, 12%); Compressors, condensers, evaporators and expansion devices (6, 9%); Cooling load calculation for cold stores (6, 9%); Ice-bank and chilled-water systems (6, 9%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Refrigerants and their environmental rules (6, 9%); Refrigerated transport and cold-chain monitoring (6, 9%); Vapour absorption refrigeration and heat pumps (6, 9%); Bulk milk coolers (5, 7%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Hardening rooms and frozen storage (5, 7%); Insulation and vapour barriers (5, 7%); Multi-pressure and ammonia systems (5, 7%); Psychrometry and air conditioning (5, 7%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Hardening rooms and frozen storage (2 hard of 5), Multi-pressure and ammonia systems (2 hard of 5), Psychrometry and air conditioning (2 hard of 5).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Bulk milk coolers (1 easy of 5); Hardening rooms and frozen storage (1 easy of 5).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — ICAR AICE-JRF/SRF Dairy Refrigeration & Cold Chain

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers