LAISHA
Open Laisha

ICAR AIEEA-PG Watershed Hydrology: practice questions

ICAR AIEEA-PG — Agricultural Engineering & Technology (Major Subject Group 10) · India · National Testing Agency for ICAR

Original practice questions written to the published syllabus · not past papers
10worked here, free
94written to this exam in this subject
13syllabus units

About ICAR AIEEA-PG

ICAR AIEEA-PG — Agricultural Engineering & Technology (Major Subject Group 10) is a postgraduate admission exam run by National Testing Agency for ICAR, for candidates in India. Computer-based, 120 minutes, 120 MCQs, +4 / −1, English only (2026 bulletin). One paper for the whole subject group.

Source: icar.org.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Watershed Hydrology in ICAR AIEEA-PG

Unit VII hydrology as single-answer MCQs: definitions (φ-index, IUH, S-curve, double-mass curve), gauge types, pan coefficients, formula recognition and short calculations with the +4/−1 marking.

Rain to runoff: measuring precipitation, subtracting losses, estimating runoff and routing floods.

Our 94 ICAR AIEEA-PG questions in this subject: 36 easy, 43 medium, 15 hard, across 13 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to ICAR AIEEA-PG and are not shown on any other exam's page.

Question 1 · medium

A 200 km² catchment has mean annual rainfall 900 mm and a mean annual flow of 1.9 m³/s at its outlet. Taking long-term storage change and groundwater exchange as zero, estimate mean annual evapotranspiration.

  1. About 300 mm
  2. About 899 mm
  3. About 1,200 mm
  4. About 600 mm
Answer and working

D. About 600 mm

Runoff depth = 1.9 × 365 × 86,400 / (200 × 10⁶) = 0.2996 m = 300 mm. ET = P − R = 900 − 300 ≈ 600 mm. 300 mm is the runoff itself, not ET; 899 mm comes from converting only one day of flow; 1,200 mm adds runoff to rainfall.

Question 2 · easy

Which rain gauge produces a series of electrical pulses, each representing a fixed small depth of rain, and is therefore well suited to telemetry?

  1. Standard non-recording gauge
  2. Natural-siphon (float) gauge
  3. Tipping-bucket gauge
  4. Storage (totaliser) gauge
Answer and working

C. Tipping-bucket gauge

Each tip of the bucket closes a contact, so the count per unit time gives intensity. The natural-siphon gauge draws a mass curve on a chart, and non-recording and storage gauges give only totals.

Question 3 · medium

Isohyets of 20, 30, 40 and 50 mm are drawn over a 200 km² catchment. Areas between successive isohyets are 60 km² (20–30), 90 km² (30–40) and 50 km² (40–50). What is the mean rainfall by the isohyetal method?

  1. 34.5 mm
  2. 35.0 mm
  3. 29.5 mm
  4. 39.5 mm
Answer and working

A. 34.5 mm

Each band takes the mean of its bounding isohyets: (25×60 + 35×90 + 45×50)/200 = 34.5 mm. Using the lower isohyet of each band gives 29.5 mm and the upper gives 39.5 mm; 35.0 mm is an unweighted average of the band means.

Question 4 · easy

Heavy rainfall on the windward slopes of a mountain range with a dry rain-shadow on the leeward side is characteristic of:

  1. convective precipitation
  2. orographic precipitation
  3. frontal precipitation
  4. cyclonic precipitation over the sea
Answer and working

B. orographic precipitation

Air forced up a barrier cools and precipitates on the windward side. Convective rain comes from local surface heating, not from a barrier.

Question 5 · medium

The largest single source of error in rainfall measured by a standard gauge is usually:

  1. evaporation from the measuring glass during the hours before it is read
  2. splash into the gauge from the surrounding ground during heavy rain
  3. condensation inside the funnel
  4. wind, which deflects drops over the orifice and causes under-catch
Answer and working

D. wind, which deflects drops over the orifice and causes under-catch

Wind turbulence around the gauge causes under-catch, more so for snow and fine drops. Evaporation and splash errors exist but are smaller with standard siting.

Question 6 · easy

Which chemical is used as a monolayer to reduce evaporation from small reservoirs?

  1. Sodium chloride (common salt)
  2. Calcium carbonate
  3. Cetyl alcohol (hexadecanol)
  4. Ammonium sulphate
Answer and working

C. Cetyl alcohol (hexadecanol)

Long-chain fatty alcohols such as cetyl alcohol form a one-molecule film that reduces evaporation in calm weather. The others are salts or minerals with no such effect.

Question 7 · easy

Hydrologic soil group A in the SCS curve number method refers to soils with:

  1. very slow infiltration and high runoff potential, such as heavy clays
  2. a high water table that stays near the surface for most of the year
  3. shallow soil over impervious rock
  4. high infiltration rates and low runoff potential, such as deep sands
Answer and working

D. high infiltration rates and low runoff potential, such as deep sands

Group A has the lowest runoff potential. Clays, high water tables and shallow soils over rock are group D.

Question 8 · easy

A curve number of 100 indicates:

  1. a deep sandy soil in which all rainfall infiltrates and none runs off
  2. an impervious or water surface where all rainfall becomes runoff
  3. average antecedent moisture
  4. the maximum possible retention
Answer and working

B. an impervious or water surface where all rainfall becomes runoff

CN = 100 gives S = 0, so Q = P. Maximum retention corresponds to CN approaching 0.

Question 9 · easy

A 6-hour unit hydrograph can be obtained from a 3-hour unit hydrograph by:

  1. doubling the ordinates of the 3-hour unit hydrograph and keeping its time base unchanged
  2. adding two 3-hour unit hydrographs lagged by 3 hours and dividing the ordinates by 2
  3. halving the ordinates of the 3-hour unit hydrograph
  4. shifting the 3-hour unit hydrograph by 6 hours and adding it to the original
Answer and working

B. adding two 3-hour unit hydrographs lagged by 3 hours and dividing the ordinates by 2

The lagged sum represents 2 cm in 6 hours, so dividing by 2 returns it to 1 cm. Simply doubling ordinates gives 2 cm in 3 hours, a different storm.

Question 10 · easy

A 6-hour unit hydrograph can be obtained from a 3-hour unit hydrograph by:

  1. doubling the ordinates of the 3-hour unit hydrograph and keeping its time base unchanged
  2. adding two 3-hour unit hydrographs lagged by 3 hours and dividing the ordinates by 2
  3. halving the ordinates of the 3-hour unit hydrograph
  4. shifting the 3-hour unit hydrograph by 6 hours and adding it to the original
Answer and working

B. adding two 3-hour unit hydrographs lagged by 3 hours and dividing the ordinates by 2

The lagged sum represents 2 cm in 6 hours, so dividing by 2 returns it to 1 cm. Simply doubling ordinates gives 2 cm in 3 hours, a different storm.

A study plan for Watershed Hydrology in ICAR AIEEA-PG

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (47% of the 94 questions): Hydrographs and the unit hydrograph (11, 12%); Flood routing: Muskingum and reservoir (Puls) methods (9, 10%); Infiltration: Horton, Philip and the phi-index (9, 10%); S-curve, IUH and synthetic unit hydrographs (8, 9%); Frequency analysis, return period and IDF curves (7, 7%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Interception and evaporation (pan) (7, 7%); Missing rainfall data and double-mass analysis (7, 7%); Precipitation measurement and rain-gauge networks (7, 7%); Runoff estimation: SCS curve number (7, 7%); Runoff estimation: rational method (6, 6%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Streamflow measurement (6, 6%); The hydrologic cycle (6, 6%); Drought classification (4, 4%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Frequency analysis, return period and IDF curves (2 hard of 7), S-curve, IUH and synthetic unit hydrographs (2 hard of 8), Flood routing: Muskingum and reservoir (Puls) methods (2 hard of 9).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Drought classification (3 easy of 4); The hydrologic cycle (4 easy of 6).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — ICAR AIEEA-PG Watershed Hydrology

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files