GATE — Agricultural Engineering (AG) · India · IITs and IISc on rotation (2027: IIT Madras)
Original practice questions written to the published syllabus · not past papersGATE — Agricultural Engineering (AG) is a postgraduate admission exam run by IITs and IISc on rotation (2027: IIT Madras), for candidates in India. Computer-based, 3 hours, 100 marks (15 General Aptitude + 85 technical: 25 one-mark and 30 two-mark questions). MCQ, MSQ and NAT; negative marking on MCQ only (−1/3 for one-mark, −2/3 for two-mark); no partial credit on MSQ. On-screen virtual calculator.
Source: gate2027.iitm.ac.in.
Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.
Numerical questions in the Soil and Water Conservation section: unit hydrograph and S-curve ordinates, rain-gauge network size and missing data, rational method and SCS curve number runoff, φ-index and Horton infiltration, Muskingum coefficients and reservoir routing, return period and risk. Answers are often numerical-answer-type, so units and rounding must be right.
Rain to runoff: measuring precipitation, subtracting losses, estimating runoff and routing floods.
Our 57 GATE questions in this subject: 8 easy, 34 medium, 15 hard, across 13 units.
Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.
These 10 were written to GATE and are not shown on any other exam's page.
In hydrograph analysis, 'effective rainfall' means:
C. rainfall that becomes direct runoff
Effective rainfall (rainfall excess) = total rainfall − abstractions, and its depth equals the direct runoff depth. Rain that recharges groundwater is an abstraction from storm runoff, not effective rainfall.
The probability that a 50-year flood is equalled or exceeded in any one year is:
B. 0.02
p = 1/T = 1/50 = 0.02. 0.98 is the probability of non-exceedance; a 50-year event is not guaranteed once in 50 years. 0.64 is the chance of at least one exceedance in 50 years (1 − 0.98⁵⁰), and 0.36 is the chance of none (0.98⁵⁰).
A spillway must have no more than a 10% risk of its design flood being exceeded during a 50-year life. The minimum design return period is about:
D. 475 years
T = 1/[1 − (1 − R)^(1/n)] = 1/[1 − 0.9^(1/50)] = 475 years. 500 years comes from the approximation T = n/R, which is close but not exact. 10 years is simply 1/R, ignoring the 50-year life.
Horton's parameters for a soil are f₀ = 50 mm/h, fc = 8 mm/h and k = 3 h⁻¹. The cumulative infiltration in the first hour, with rainfall always exceeding capacity, is:
A. 21.30 mm
F = fc t + (f₀ − fc)(1 − e^(−kt))/k = 8 + (42/3)(1 − e⁻³) = 21.30 mm. 10.09 is the rate at 1 h, not the depth; 13.30 omits the fc·t term. 50.00 mm takes f₀ for the whole hour.
The longest flow path in a small watershed is 1,200 m with a fall of 18 m. The time of concentration by Kirpich's formula tc = 0.01947 L^0.77 S^−0.385 (tc in min, L in m) is about:
C. 23.0 min
S = 18/1200 = 0.015; tc = 0.01947 × 1200^0.77 × 0.015^−0.385 = 0.01947 × 234.9 × 5.037 = 23.0 min. Entering L in km gives 0.11; entering the slope as a percentage (1.5) gives 3.9. 0.38 is the correct time converted to hours (23.0/60) but labelled minutes.
Urbanisation of a small catchment doubles its runoff coefficient and, by shortening tc, raises the design intensity from 50 to 70 mm/h. By the rational method, the peak increases by a factor of:
D. 2.8
Q ∝ C × i, so the factor is 2 × (70/50) = 2 × 1.4 = 2.8. 2.0 ignores the change in tc; 1.4 ignores the change in C; 3.4 adds the factors.
For a curve number of 80, the potential maximum retention S in SI units is:
A. 63.5 mm
S = 25400/CN − 254 = 317.5 − 254 = 63.5 mm. 317.5 forgets to subtract 254; 2.5 is the inch value (1000/80 − 10) mis-labelled in mm; 12.7 mm is Ia = 0.2S.
A watershed has CN = 70 for AMC II. Using CN(III) = CN(II)/(0.427 + 0.00573 CN(II)), the curve number for wet antecedent conditions (AMC III) is:
C. 84.5
CN(III) = 70/(0.427 + 0.4011) = 84.5. 50.6 is CN(I) for dry conditions; wet soils must raise, not lower, the CN. 58.0 multiplies by (0.427 + 0.00573 CN) instead of dividing.
For baseflow separation, the end of direct runoff is often taken N days after the peak, with N = 0.83 A^0.2 (A in km²). For a 1,500 km² catchment, N is about:
B. 3.58 days
N = 0.83 × 1500^0.2 = 0.83 × 4.317 = 3.58 days. 4.32 drops the 0.83 (it is the original formula for area in square miles). Using A^0.5 gives 32.1 days, and entering the area in hectares (150,000) gives 9.00 days.
By Snyder's method a basin has lag tp = 11 h, so the standard duration is tr = tp/5.5 = 2 h. For a 4-hour unit hydrograph, the adjusted lag is:
B. 11.5 h
tpR = tp + (tR − tr)/4 = 11 + (4 − 2)/4 = 11.5 h. 13.0 adds the whole difference in duration; 11.0 ignores the adjustment. 12.0 h divides the duration difference by 2 instead of 4.
This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.
Read the manual chapters for these first and do every worked question you can find on them.
Aim for one sitting per unit, then mixed questions across them.
Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.
Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.
Do these early in revision so they are fast on the day.
Last updated · How Laisha writes and checks its pages · Report a mistake
US$10 a month · one price worldwide · cancel any time
| Free | Smarter | |
|---|---|---|
| Grow guides, pest pages, articles | Read all | Read all |
| Ask Laisha | 5 a day | Up to 1,000 a month |
| Exam practice | The sample on each page | Every question, timed papers |
| Crop calendar and pest alerts | — | For your own fields |
| Calculators and tools | — | All |
| Uploads and reports | — | 100 a month, real files |
An AI operating system for agriculture: free guides, manuals and tools written for every country.