GATE Surveying & Levelling: practice questions

GATE — Agricultural Engineering (AG) · India · IITs and IISc on rotation (2027: IIT Madras)

Original practice questions written to the published syllabus · not past papers
10worked here, free
89written to this exam in this subject
12syllabus units

About GATE

GATE — Agricultural Engineering (AG) is a postgraduate admission exam run by IITs and IISc on rotation (2027: IIT Madras), for candidates in India. Computer-based, 3 hours, 100 marks (15 General Aptitude + 85 technical: 25 one-mark and 30 two-mark questions). MCQ, MSQ and NAT; negative marking on MCQ only (−1/3 for one-mark, −2/3 for two-mark); no partial credit on MSQ. On-screen virtual calculator.

Source: gate2027.iitm.ac.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Surveying & Levelling in GATE

Short numericals, often NAT: tape corrections (temperature, pull, sag, slope, wrong length and area), RLs by HI and rise-and-fall with the arithmetic check, reciprocal levelling, curvature and refraction, WCB to QB and included angles, traverse closing error and Bowditch corrections, stadia distance, trapezoidal and Simpson areas, prismoidal and trapezoidal volumes. Since 2021 the syllabus also names total station and GPS.

Measuring land, levels and volumes, from chain survey to total station and GNSS, and designing land grading.

Our 89 GATE questions in this subject: 33 easy, 38 medium, 18 hard, across 12 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to GATE and are not shown on any other exam's page.

Question 1 · easy

How many links does a 20 m metric chain have, and what is the length of one link?

  1. 200 links of 0.1 m
  2. 150 links of 0.2 m
  3. 100 links of 0.3 m
  4. 100 links of 0.2 m
Answer and working

D. 100 links of 0.2 m

A 20 m metric chain has 100 links, so each link is 20/100 = 0.2 m. The 30 m chain has 150 links of 0.2 m, which is where 150 links comes from; Gunter's chain also has 100 links but is 66 ft long. 200 links of 0.1 m describes a tape graduated in decimetres, not a chain.

Question 2 · easy

In chain surveying, a well-conditioned triangle is one in which

  1. all three sides are equal
  2. one angle is exactly 90° so the offsets are square
  3. angles are 30°–120°
  4. every angle is less than 30°, giving a long thin triangle
Answer and working

C. angles are 30°–120°

The apex of a triangle is fixed by intersecting arcs; if an angle is very acute or very obtuse, the arcs meet at a flat angle and a small taping error moves the plotted point a long way. The usual rule is to keep angles between about 30° and 120°. An equilateral triangle is ideal but not required, and a right angle has no special merit.

Question 3 · easy

A line was measured as 640 m with a 20 m chain that was later found to be 20.08 m long. What is the true length?

  1. 642.56 m
  2. 637.45 m
  3. 645.13 m
  4. 640.08 m
Answer and working

A. 642.56 m

True length = measured × actual/nominal = 640 × 20.08/20 = 642.56 m. A chain that is too long is laid out fewer times, so the booked figure is too small and must be increased. Dividing instead (637.45 m) is the classic reversal; squaring the ratio belongs to areas, not lengths. 645.13 m squares the ratio; 640.08 m simply adds the 0.08 m error once.

Question 4 · medium

The magnetic bearing of a line is N 48°20′ W and the magnetic declination is 3°40′ E. What is its true whole-circle bearing?

  1. 308°00′
  2. 311°40′
  3. 44°40′
  4. 315°20′
Answer and working

D. 315°20′

Convert to WCB: N 48°20′ W = 360° − 48°20′ = 311°40′. With east declination, true = magnetic + declination = 311°40′ + 3°40′ = 315°20′. Subtracting the declination gives 308°00′; 311°40′ ignores declination.

Question 5 · hard

Compared with the three-point problem, the two-point problem in plane tabling

  1. needs an auxiliary station and is less accurate and more laborious
  2. needs no orientation at all
  3. is more accurate because fewer rays are drawn and fewer errors accumulate
  4. can be solved only by tracing paper
Answer and working

A. needs an auxiliary station and is less accurate and more laborious

With only two known points the table must be taken to an auxiliary station and back, and orientation is completed by rotating through an error angle, so errors accumulate. The three-point problem is preferred whenever three points are visible.

Question 6 · medium

Two grid points 30 m apart have RLs 148.62 m and 151.12 m. Assuming a uniform slope, how far from the lower point does the 150.00 m contour pass?

  1. 36.96 m
  2. 13.44 m
  3. 0.55 m
  4. 16.56 m
Answer and working

D. 16.56 m

By proportion, distance = 30 × (150.00 − 148.62)/(151.12 − 148.62) = 30 × 1.38/2.50 = 16.56 m. 13.44 m is the distance from the higher point. 36.96 m divides by the difference to the higher point (1.12 m) instead of the total rise; 0.55 m is the fraction 1.38/2.50 without multiplying by 30 m.

Question 7 · hard

An RTK GNSS survey gives an ellipsoidal height of 18.6 m at a point where the geoid undulation N from the geoid model is −52.3 m. What is the orthometric height (height above the geoid)?

  1. 18.6 m
  2. -70.9 m
  3. 70.9 m
  4. -33.7 m
Answer and working

C. 70.9 m

H = h − N = 18.6 − (−52.3) = 70.9 m. Where the geoid lies below the ellipsoid (negative N), orthometric heights exceed ellipsoidal heights. Adding N gives -33.7 m; using the ellipsoidal height as if it were above mean sea level is the classic mistake.

Question 8 · medium

A GNSS receiver reports a high PDOP value. What does this indicate?

  1. Poor satellite geometry, so position accuracy is degraded
  2. Strong signal-to-noise ratio
  3. Many satellites evenly spread across the sky
  4. Low ionospheric delay
Answer and working

A. Poor satellite geometry, so position accuracy is degraded

Dilution of precision measures how satellite geometry magnifies range errors into position error; high PDOP means satellites are bunched or low, so accuracy falls. Lower is better.

Question 9 · easy

Simpson's one-third rule can be applied directly only when the number of

  1. ordinates is odd (an even number of intervals)
  2. intervals is odd
  3. ordinates exceeds ten
  4. ordinates is even (an odd number of intervals)
Answer and working

A. ordinates is odd (an even number of intervals)

The rule fits a parabola over each pair of strips, so the number of strips must be even and the number of ordinates odd. With an even number of ordinates, the last strip is computed separately by the trapezoidal rule.

Question 10 · medium

An area measured on a 1:2000 plan is 42.5 cm². What is the ground area?

  1. 17.0 ha
  2. 17000 ha
  3. 1.70 ha
  4. 0.085 ha
Answer and working

C. 1.70 ha

1 cm² on the plan = (20 m)² = 400 m². So 42.5 × 400 = 17,000 m² = 1.70 ha. Scaling by the RF once instead of squared is the classic slip. 17.0 ha is a factor-of-ten slip; 0.085 ha scales by 20 m once (42.5 × 20 = 850 m²) instead of squared.

A study plan for Surveying & Levelling in GATE

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (42% of the 89 questions): Theodolite traversing and closing error (11, 12%); Chain and tape surveying, including tape corrections (10, 11%); Levelling: rise-and-fall and height-of-instrument methods (8, 9%); Reciprocal levelling (8, 9%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Compass traversing and bearings (7, 8%); Contouring (7, 8%); Earthwork volume computation (7, 8%); Plane table surveying (7, 8%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Computation of area: trapezoidal and Simpson's rules (6, 7%); GPS/GNSS surveying (6, 7%); Land grading and levelling design (6, 7%); Total station (6, 7%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Levelling: rise-and-fall and height-of-instrument methods (3 hard of 8), Compass traversing and bearings (2 hard of 7), Earthwork volume computation (2 hard of 7).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Chain and tape surveying, including tape corrections (5 easy of 10); Land grading and levelling design (3 easy of 6).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — GATE Surveying & Levelling

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.