LAISHA
Open Laisha

GATE Groundwater, Wells & Pumps: practice questions

GATE — Agricultural Engineering (AG) · India · IITs and IISc on rotation (2027: IIT Madras)

Original practice questions written to the published syllabus · not past papers
10worked here, free
70written to this exam in this subject
16syllabus units

About GATE

GATE — Agricultural Engineering (AG) is a postgraduate admission exam run by IITs and IISc on rotation (2027: IIT Madras), for candidates in India. Computer-based, 3 hours, 100 marks (15 General Aptitude + 85 technical: 25 one-mark and 30 two-mark questions). MCQ, MSQ and NAT; negative marking on MCQ only (−1/3 for one-mark, −2/3 for two-mark); no partial credit on MSQ. On-screen virtual calculator.

Source: gate2027.iitm.ac.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Groundwater, Wells & Pumps in GATE

Numerical-answer and MCQ items on Thiem and Dupuit discharge, transmissivity from test data and well interference appear in most papers; pump power, specific speed and affinity-law scaling are frequent. Theis unsteady flow is in the syllabus but has been asked rarely; learn Cooper-Jacob straight-line analysis so it is quick. Watch natural versus common logarithms and unit conversions (L/s, m³/day, minutes to days).

Aquifers, well hydraulics, well design and the pumps that lift the water — asked in some form in every GATE AG paper.

Our 70 GATE questions in this subject: 21 easy, 38 medium, 11 hard, across 16 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to GATE and are not shown on any other exam's page.

Question 1 · medium

An unconfined aquifer underlying 3 km² has a specific yield of 0.15. If the water table falls by 2 m over a dry season, the volume of water released from storage is:

  1. 6.00 million m³
  2. 900 m³
  3. 0.90 million m³
  4. 0.0018 million m³
Answer and working

C. 0.90 million m³

ΔV = Sy × A × Δh = 0.15 × 3,000,000 m² × 2 m = 900,000 m³ = 0.90 million m³. Forgetting Sy gives 6 million m³ (the whole rock volume); writing 900 m³ is a factor-of-1000 unit slip. 0.0018 million m³ uses a confined storage coefficient (3 × 10⁻⁴) in place of Sy.

Question 2 · medium

A fully penetrating well pumps a confined aquifer with T = 500 m²/day. At steady state, observation wells at 10 m and 100 m show drawdowns of 3.2 m and 1.4 m. The pumping rate is:

  1. 2,456 m³/day
  2. 5,655 m³/day
  3. 1,228 m³/day
  4. 6,276 m³/day
Answer and working

A. 2,456 m³/day

Thiem: Q = 2πT(s₁ − s₂)/ln(r₂/r₁) = 2π × 500 × 1.8 / ln 10 = 5,654.9/2.3026 = 2,456 m³/day. Using log₁₀ 10 = 1 gives 5,655; using π instead of 2π halves the answer; adding the drawdowns (4.6 m) is wrong because only the difference drives flow between the two wells.

Question 3 · medium

A well pumps 1,500 m³/day from a confined aquifer with T = 600 m²/day. At a certain observation well and time, W(u) = 4.04. The drawdown is:

  1. 1.61 m
  2. 0.049 m
  3. 10.10 m
  4. 0.80 m
Answer and working

D. 0.80 m

s = QW(u)/(4πT) = 1500 × 4.04/(4π × 600) = 6060/7539.8 = 0.80 m. Using 2π doubles it; dividing by W(u) inverts the relation. 10.10 m leaves out the 4π (1500 × 4.04 ÷ 600).

Question 4 · hard

From a Cooper-Jacob plot, T = 704 m²/day and the straight line intercepts zero drawdown at t₀ = 1.2 min. The observation well is 60 m from the pumped well. The storativity is:

  1. 0.528
  2. 2.20 × 10⁻²
  3. 8.80 × 10⁻³
  4. 3.67 × 10⁻⁴
Answer and working

D. 3.67 × 10⁻⁴

S = 2.25Tt₀/r² with t₀ in days: t₀ = 1.2/1440 = 8.33 × 10⁻⁴ day; S = 2.25 × 704 × 8.33 × 10⁻⁴/3600 = 3.67 × 10⁻⁴. Leaving t₀ in minutes gives 0.528 (impossible for a confined aquifer); using r instead of r² or converting to hours are the other slips.

Question 5 · medium

In a Theis recovery analysis, residual drawdown s′ is plotted on an arithmetic scale against:

  1. log t′ only
  2. t × t′ on an arithmetic scale, with both times in minutes
  3. log(t/t′), with t from pump start and t′ from pump stop
  4. log(r²/t)
Answer and working

C. log(t/t′), with t from pump start and t′ from pump stop

Theis recovery: s′ = (2.3Q/4πT) log₁₀(t/t′), so the plot against log(t/t′) is straight and T = 2.3Q/(4πΔs′). Recovery data are free of pumping-rate fluctuations.

Question 6 · easy

The primary purpose of a cement or bentonite grout seal in the upper annulus of a well is to:

  1. Increase the yield of the aquifer by sealing off losses of pressure
  2. Support the pump weight
  3. Stop surface water and contaminants moving down the outside of the casing
  4. Act as the gravel pack for the upper aquifer, admitting water to the casing
Answer and working

C. Stop surface water and contaminants moving down the outside of the casing

The sanitary seal closes the annular pathway for surface contamination. It has no role in yield.

Question 7 · medium

In mechanical surging, well development is achieved by:

  1. Pumping continuously at the design rate only, so the formation settles gradually around the screen
  2. Injecting cement into the screen
  3. Lowering an explosive charge into the aquifer
  4. Moving a close-fitting surge block up and down in the casing to force water through the screen
Answer and working

D. Moving a close-fitting surge block up and down in the casing to force water through the screen

The surge block creates alternating inflow and outflow through the screen. Overpumping moves water in one direction only and is less effective.

Question 8 · medium

In a Wenner survey with electrode spacing a = 20 m, a current of 150 mA produces a potential difference of 45 mV. The apparent resistivity is:

  1. 37.7 Ω·m
  2. 18.8 Ω·m
  3. 6.0 Ω·m
  4. 418.9 Ω·m
Answer and working

A. 37.7 Ω·m

R = ΔV/I = 0.045/0.150 = 0.3 Ω; ρₐ = 2πaR = 2π × 20 × 0.3 = 37.7 Ω·m. π·a·R and a·R omit parts of the geometric factor; I/ΔV inverts the ratio.

Question 9 · medium

The most common operational problem in surface recharge basins, and its usual management, is:

  1. Excessive infiltration rates, managed by compacting the basin floor with heavy rollers
  2. Clogging of the infiltration surface, managed by wet-dry cycling and scraping
  3. Corrosion of the basin walls, managed by fitting cathodic protection
  4. Rising salinity, managed by adding chloride
Answer and working

B. Clogging of the infiltration surface, managed by wet-dry cycling and scraping

Suspended sediment, algae and bacteria seal the basin floor. Drying cracks and oxidises the layer; scraping removes it. Injection wells need filtered water and backflushing for the same reason.

Question 10 · medium

A pump delivers 25 L/s against a total head of 35 m. Pump efficiency is 70% and motor efficiency 88%. The electrical input power is:

  1. 8.58 kW
  2. 5.29 kW
  3. 12.26 kW
  4. 13.93 kW
Answer and working

D. 13.93 kW

Water power = ρgQH = 1000 × 9.81 × 0.025 × 35 = 8.58 kW. Shaft = 8.58/0.70 = 12.26 kW. Input = 12.26/0.88 = 13.93 kW. Multiplying by efficiencies instead of dividing is a classic slip.

A study plan for Groundwater, Wells & Pumps in GATE

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (46% of the 70 questions): Aquifer types and properties: T, S and Sy (6, 9%); Centrifugal pump characteristic curves (6, 9%); Darcy's law in aquifers (5, 7%); Pumping tests (5, 7%); Steady flow to wells: Thiem and Dupuit (5, 7%); Unsteady flow: Theis and Cooper-Jacob (5, 7%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Well design: screen and gravel pack (5, 7%); Well drilling and development (5, 7%); Classification of pumps (4, 6%); Groundwater exploration: resistivity (4, 6%); Specific speed and affinity laws (4, 6%); Well interference (4, 6%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: NPSH and cavitation (3, 4%); Pump selection and installation (3, 4%); Recharge estimation and artificial recharge (3, 4%); Solar pumping (3, 4%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Steady flow to wells: Thiem and Dupuit (2 hard of 5), Centrifugal pump characteristic curves (2 hard of 6), Pump selection and installation (1 hard of 3).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Aquifer types and properties: T, S and Sy (3 easy of 6); Classification of pumps (2 easy of 4).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — GATE Groundwater, Wells & Pumps

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.