LAISHA
Open Laisha

GATE Irrigation Engineering (Soil-Water-Plant, Conveyance, Surface Methods): practice questions

GATE — Agricultural Engineering (AG) · India · IITs and IISc on rotation (2027: IIT Madras)

Original practice questions written to the published syllabus · not past papers
10worked here, free
71written to this exam in this subject
14syllabus units

About GATE

GATE — Agricultural Engineering (AG) is a postgraduate admission exam run by IITs and IISc on rotation (2027: IIT Madras), for candidates in India. Computer-based, 3 hours, 100 marks (15 General Aptitude + 85 technical: 25 one-mark and 30 two-mark questions). MCQ, MSQ and NAT; negative marking on MCQ only (−1/3 for one-mark, −2/3 for two-mark); no partial credit on MSQ. On-screen virtual calculator.

Source: gate2027.iitm.ac.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Irrigation Engineering (Soil-Water-Plant, Conveyance, Surface Methods) in GATE

Numerical: net and gross irrigation depth from field capacity, present moisture and bulk density; irrigation interval from available water, MAD and ETc; area a tubewell can command; Kc × ET₀; weir and flume discharge; application, storage and uniformity (Christiansen CU, low-quarter DU) calculations. Most items need a calculation; watch mass versus volume basis and unit conversions.

How much water a crop needs, when to give it, how to measure and convey it, and how to design surface irrigation.

Our 71 GATE questions in this subject: 28 easy, 34 medium, 9 hard, across 14 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to GATE and are not shown on any other exam's page.

Question 1 · medium

Cumulative infiltration in a basin follows the Kostiakov equation I = 1.5 t^0.5, with I in cm and t in hours. How long must water stand to infiltrate 4.5 cm?

  1. 3 h
  2. 1.5 h
  3. 6 h
  4. 9 h
Answer and working

D. 9 h

t = (I / a)^(1/b) = (4.5 / 1.5)^2 = 3² = 9 h. 3 h forgets to square (it treats the exponent as 1); 6 h doubles instead of squaring; 1.5 h confuses the coefficient with time.

Question 2 · medium

Class A pan evaporation is 8.0 mm/day, the pan coefficient is 0.70 and the crop coefficient is 1.10. What is the crop evapotranspiration?

  1. 12.57 mm/day
  2. 5.60 mm/day
  3. 6.16 mm/day
  4. 8.80 mm/day
Answer and working

C. 6.16 mm/day

ET₀ = Kp × Epan = 0.70 × 8.0 = 5.60 mm/day; ETc = Kc × ET₀ = 1.10 × 5.60 = 6.16 mm/day. 5.60 stops at ET₀; 8.80 skips the pan coefficient; 12.57 divides by Kp instead of multiplying.

Question 3 · medium

For the same crop and climate, which condition gives the highest Kc ini?

  1. A dry soil surface with drip under a plastic mulch
  2. Light irrigation every two days
  3. Irrigation every 10 days on a coarse sand
  4. One heavy irrigation just before planting, then none for the stage
Answer and working

B. Light irrigation every two days

In the initial stage ET is dominated by soil evaporation, so Kc ini rises with the frequency of surface wetting and can approach 1.0 or more. Infrequent wetting, mulches and fast-drying sands keep the surface dry and Kc ini low.

Question 4 · medium

Using the USDA SCS formula as simplified in FAO CROPWAT, what is the effective rainfall for a month with 200 mm of rain?

  1. 200 mm
  2. 145 mm
  3. 136 mm
  4. 160 mm
Answer and working

C. 136 mm

For P ≤ 250 mm: Pe = P (125 − 0.2P)/125 = 200 × (125 − 40)/125 = 136 mm. 145 mm uses the P > 250 mm branch (125 + 0.1P); 160 mm is a fixed 80 %; 200 mm treats all rain as effective.

Question 5 · easy

A wheat scheduling recommendation is an IW/CPE ratio of 0.8 with an irrigation depth of 50 mm. At what cumulative pan evaporation since the last irrigation should the next irrigation be given?

  1. 40 mm
  2. 80 mm
  3. 50 mm
  4. 62.5 mm
Answer and working

D. 62.5 mm

CPE = IW / ratio = 50 / 0.8 = 62.5 mm. 40 mm multiplies instead of dividing; 50 mm ignores the ratio; 80 mm confuses the ratio with the CPE.

Question 6 · easy

When flow is estimated with surface floats, the float velocity is multiplied by a coefficient less than one because:

  1. Wind always slows floats
  2. Floats always travel slower than the water around them because of drag
  3. Surface velocity is higher than the mean velocity over the section
  4. The cross-sectional area is overestimated
Answer and working

C. Surface velocity is higher than the mean velocity over the section

Velocity is highest near the surface and lowest near the bed and banks, so mean velocity is typically about 0.8–0.9 of surface velocity. Wind can push floats either way, and area is a separate measurement.

Question 7 · easy

A lined rectangular channel is to have a flow area of 2.0 m² and the best hydraulic section. What are its depth and width?

  1. Depth 1.0 m, width 2.0 m
  2. Depth 0.5 m, width 4.0 m
  3. Depth 1.41 m, width 1.41 m
  4. Depth 2.0 m, width 1.0 m
Answer and working

A. Depth 1.0 m, width 2.0 m

For the best rectangle b = 2y, so A = 2y² = 2.0 and y = 1.0 m, b = 2.0 m. A square section (1.41 × 1.41) has a larger wetted perimeter (4.24 m versus 4.0 m); the others are further from optimum.

Question 8 · easy

Which of these is an earth-type (non-rigid, soil-based) canal lining?

  1. Cast-in-place concrete
  2. Soil-cement
  3. Asphaltic concrete
  4. Brick masonry
Answer and working

B. Soil-cement

Soil-cement, compacted earth and bentonite blankets are earth linings. Concrete, brick and asphaltic concrete are hard-surface linings.

Question 9 · medium

What is the purpose of cutback irrigation in furrows?

  1. To shorten the furrow length each season
  2. To cut the crop back before irrigation
  3. To advance quickly with a large stream, then reduce it to about the intake rate to limit runoff
  4. To start with a small stream, usually to prevent erosion, then increase it once the furrow has fully wetted
Answer and working

C. To advance quickly with a large stream, then reduce it to about the intake rate to limit runoff

A large initial stream reduces advance time and the head-tail opportunity-time difference; reducing it after advance matches inflow to intake and cuts tailwater. Starting small slows advance, the opposite of the aim.

Question 10 · medium

A wheat crop yields 6,000 kg/ha of grain with a seasonal ET of 500 mm. What is its crop water use efficiency?

  1. 1.2 kg/m³
  2. 12 kg/m³
  3. 0.12 kg/m³
  4. 120 kg/m³
Answer and working

A. 1.2 kg/m³

500 mm on 1 ha = 0.5 m × 10,000 m² = 5,000 m³. WUE = 6,000 / 5,000 = 1.2 kg/m³. The others are factor-of-ten or hundred slips in converting mm·ha to m³. 12 and 0.12 kg/m³ are factor-of-ten slips, and 120 kg/m³ a factor-of-hundred slip.

A study plan for Irrigation Engineering (Soil-Water-Plant, Conveyance, Surface Methods) in GATE

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (46% of the 71 questions): Evapotranspiration and FAO-56 Penman-Monteith (8, 11%); Design of irrigation channels (7, 10%); Crop coefficients and crop water requirement (6, 8%); Soil-water-plant relations: field capacity, wilting point and MAD (6, 8%); Water measurement: weirs, Parshall flume and orifices (6, 8%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Effective rainfall (5, 7%); Furrow irrigation (5, 7%); Irrigation efficiencies and distribution uniformity (5, 7%); Irrigation scheduling (5, 7%); Border irrigation (4, 6%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Canal lining (4, 6%); Underground pipeline systems (4, 6%); Basin irrigation (3, 4%); Command area development (3, 4%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Underground pipeline systems (2 hard of 4), Crop coefficients and crop water requirement (2 hard of 6), Design of irrigation channels (2 hard of 7).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Command area development (2 easy of 3); Irrigation efficiencies and distribution uniformity (3 easy of 5).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — GATE Irrigation Engineering (Soil-Water-Plant, Conveyance, Surface Methods)

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.