Rajasthan PSC Irrigation Engineering (Soil-Water-Plant, Conveyance, Surface Methods): practice questions

Rajasthan PSC — Assistant Agriculture Engineer (Agriculture Engineering syllabus) · India · Rajasthan Public Service Commission

Original practice questions written to the published syllabus · not past papers
10worked here, free
50written to this exam in this subject
14syllabus units

About Rajasthan PSC

Rajasthan PSC — Assistant Agriculture Engineer (Agriculture Engineering syllabus) is a government recruitment exam run by Rajasthan Public Service Commission, for candidates in India. Objective paper; the paper structure was not captured.

Source: rpsc.rajasthan.gov.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Irrigation Engineering (Soil-Water-Plant, Conveyance, Surface Methods) in Rajasthan PSC

How much water a crop needs, when to give it, how to measure and convey it, and how to design surface irrigation.

Our 50 Rajasthan PSC questions in this subject: 28 easy, 21 medium, 1 hard, across 14 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to Rajasthan PSC and are not shown on any other exam's page.

Question 1 · medium

How long must a stream of 25 L/s run to apply 6 cm to 2 ha?

  1. 13.3 h
  2. 133 h
  3. 1.33 h
  4. 48 h
Answer and working

A. 13.3 h

Volume = 2 ha × 10,000 m²/ha × 0.06 m = 1,200 m³. Flow = 25 L/s = 90 m³/h. Time = 1,200/90 = 13.3 h. 1.33 h takes 1 ha as 1,000 m²; 133 h takes 1 ha-cm as 1,000 m³; 48 h reads 25 L/s as 25 m³/h.

Question 2 · medium

A sharp-crested rectangular weir 1.2 m long has two end contractions and a head of 0.25 m. Using the Francis formula, what is the discharge?

  1. 0.276 m³/s
  2. 0.066 m³/s
  3. 0.253 m³/s
  4. 0.265 m³/s
Answer and working

D. 0.265 m³/s

Q = 1.84 (L − 0.1 n H) H^1.5 = 1.84 × (1.2 − 0.05) × 0.125 = 0.265 m³/s. 0.276 ignores the contractions; 0.253 doubles the contraction correction; 0.066 uses the V-notch exponent 2.5.

Question 3 · easy

Which method of measuring canal seepage is generally regarded as the most accurate?

  1. Ponding test
  2. Inflow-outflow method
  3. Seepage meter
  4. Moritz formula
Answer and working

A. Ponding test

Ponding isolates a reach and measures the fall of a still water surface, corrected for evaporation and rain. Inflow-outflow depends on the difference of two large, uncertain flows; seepage meters sample small spots; Moritz is an empirical estimate, not a measurement.

Question 4 · medium

A canal reach 2 km long has a wetted perimeter of 4 m and loses 0.25 m³ per m² of wetted area per day. It runs 200 days a year. Lining will cut seepage by 80 %. How much water is saved per year?

  1. 400,000 m³
  2. 80,000 m³
  3. 1,600 m³
  4. 320,000 m³
Answer and working

D. 320,000 m³

Wetted area = 4 × 2,000 = 8,000 m². Loss = 0.25 × 8,000 = 2,000 m³/day; × 200 days = 400,000 m³/year; saving = 0.8 × 400,000 = 320,000 m³. 400,000 m³ is the whole loss; 1,600 m³ is the daily saving; 80,000 m³ is the remaining loss after lining.

Question 5 · easy

Which is a real advantage of replacing an earthen watercourse with a buried pipeline?

  1. Near-zero conveyance loss and no farmland lost to channels
  2. Pipelines raise the groundwater table in the command
  3. Pipelines never need maintenance
  4. No energy or head is needed to move water
Answer and working

A. Near-zero conveyance loss and no farmland lost to channels

Buried pipe eliminates seepage and evaporation from the watercourse and frees the land it occupied. Head is still needed to overcome friction, valves need maintenance, and reducing seepage lowers rather than raises recharge.

Question 6 · medium

Furrows 120 m long at 0.9 m spacing must receive a gross depth of 60 mm. The stream per furrow is 1.5 L/s. How long must each furrow run (neglecting runoff)?

  1. 7.2 min
  2. 72 min
  3. 720 min
  4. 80 min
Answer and working

B. 72 min

Volume = 0.06 × 0.9 × 120 = 6.48 m³; time = 6.48 / 0.0015 = 4320 s = 72 min. 7.2 and 720 min are factor-of-ten slips; 80 min ignores furrow spacing (treats the furrow as 1 m wide).

Question 7 · easy

The culturable command area of a canal is:

  1. The whole catchment area draining to the reservoir
  2. The gross command area minus unculturable land such as villages, roads, ponds and barren land
  3. The gross command area plus adjoining rainfed land
  4. The area actually irrigated in a given season, after deducting fields left fallow by their owners
Answer and working

B. The gross command area minus unculturable land such as villages, roads, ponds and barren land

CCA excludes land that cannot be cultivated. The area actually irrigated divided by CCA is the intensity of irrigation. The catchment feeds the reservoir and is unrelated to the command.

Question 8 · easy

India's centrally sponsored Command Area Development programme was launched in:

  1. 1990–91
  2. 2015–16
  3. 1951–52
  4. 1974–75
Answer and working

D. 1974–75

The CAD programme began in 1974–75 to bridge the gap between irrigation potential created and utilised. It became CADWM in 2004 and has been implemented under PMKSY (Har Khet Ko Pani) since 2015–16; 1951 marks the First Five-Year Plan. 1990–91 is the launch of NWDPRA, not CAD.

Question 9 · medium

Which set of works forms the core of on-farm development under command area development?

  1. Tubewell electrification and crop insurance
  2. Main canal lining and headworks gates
  3. Construction of the main dam and spillway
  4. Field channels, field drains, land levelling and shaping, and realignment of field boundaries
Answer and working

D. Field channels, field drains, land levelling and shaping, and realignment of field boundaries

On-farm development works are below the outlet: field channels, drains, levelling and shaping. Dams, headworks and main canal lining are part of the main system, and insurance is not a CAD work.

Question 10 · medium

In South Asian canal practice, 'kor watering' refers to:

  1. The first watering after sowing (or transplanting), whose depth and period often govern canal capacity
  2. Pre-monsoon flushing of the canal
  3. Water given to orchards in winter
  4. The last watering before harvest (usually in the dough stage)
Answer and working

A. The first watering after sowing (or transplanting), whose depth and period often govern canal capacity

Kor watering is the first irrigation after the crop is sown; it is given within a limited kor period, so it creates a peak demand that fixes canal capacity. The other options are unrelated operations.

A study plan for Irrigation Engineering (Soil-Water-Plant, Conveyance, Surface Methods) in Rajasthan PSC

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (58% of the 50 questions): Command area development (8, 16%); Design of irrigation channels (6, 12%); Canal lining (5, 10%); Irrigation scheduling (5, 10%); Water measurement: weirs, Parshall flume and orifices (5, 10%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Basin irrigation (3, 6%); Border irrigation (3, 6%); Evapotranspiration and FAO-56 Penman-Monteith (3, 6%); Irrigation efficiencies and distribution uniformity (3, 6%); Soil-water-plant relations: field capacity, wilting point and MAD (3, 6%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Effective rainfall (2, 4%); Furrow irrigation (2, 4%); Crop coefficients and crop water requirement (1, 2%); Underground pipeline systems (1, 2%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Irrigation scheduling (1 hard of 5).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Irrigation efficiencies and distribution uniformity (3 easy of 3); Soil-water-plant relations: field capacity, wilting point and MAD (3 easy of 3).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — Rajasthan PSC Irrigation Engineering (Soil-Water-Plant, Conveyance, Surface Methods)

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.