LAISHA
Open Laisha

NCEES PE Agricultural and Biological Engineering Surveying & Levelling: practice questions

NCEES PE Agricultural and Biological Engineering · USA · NCEES (ASABE is the content partner)

Original practice questions written to the published syllabus · not past papers
10worked here, free
20written to this exam in this subject
9syllabus units

About NCEES PE Agricultural and Biological Engineering

NCEES PE Agricultural and Biological Engineering is a licensing and registration exam run by NCEES (ASABE is the content partner), for candidates in USA. Computer-based, 85 questions, 9.5-hour appointment (8.5 hours of exam). Once a year (next: 28 Oct 2026). Closed book with the electronic NCEES handbook and supplied searchable ASABE standards; SI and US customary units.

Source: ncees.org.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Surveying & Levelling in NCEES PE Agricultural and Biological Engineering

Surveying appears within common system applications: layout and grade staking, earthwork volumes, pond and channel grades, and interpretation of survey data in US customary or SI units.

Measuring land, levels and volumes, from chain survey to total station and GNSS, and designing land grading.

Our 20 NCEES PE Agricultural and Biological Engineering questions in this subject: 0 easy, 10 medium, 10 hard, across 9 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to NCEES PE Agricultural and Biological Engineering and are not shown on any other exam's page.

Question 1 · hard

A staff is read from a level. The staff reading is 3.000 m when held vertical, but the staff was actually tilted 3° from the vertical in the direction of sight. What reading was observed (to 3 decimals), and what is the lesson?

  1. 3.000 m; tilt has no effect on a horizontal sight
  2. 2.996 m; a tilted staff reads too low
  3. 3.004 m; a tilted staff always reads too high
  4. 3.157 m; the error is proportional to sin θ
Answer and working

C. 3.004 m; a tilted staff always reads too high

The horizontal line cuts the tilted staff at a graduation of 3.000/cos 3° = 3.004 m. Tilt in any direction increases the reading, which is why the staffman rocks the staff and the minimum reading is taken.

Question 2 · medium

A graded channel is to be traced on a gradient of 1 in 400 falling downstream, with pegs every 20 m. By how much must the staff reading increase from one peg to the next?

  1. 50 mm
  2. 20 mm
  3. 5.0 mm
  4. 25 mm
Answer and working

A. 50 mm

Fall per peg = 20/400 = 0.050 m = 50 mm; each successive peg is lower, so the staff reading increases by that amount. The other options are unit or inversion slips. 5.0 mm is a factor-of-ten slip; 25 mm halves it.

Question 3 · medium

An engineer must set out the corners of a farm pond from design coordinates using a total station. Which on-board function is used?

  1. Area computation
  2. Remote elevation measurement
  3. Stake-out
  4. Missing-line measurement
Answer and working

C. Stake-out

Stake-out computes the bearing and distance from the occupied station to each design point and guides the prism holder onto it. Missing-line measures between two observed points; remote elevation finds heights of inaccessible objects.

Question 4 · hard

A surveyor occupies an unknown point and observes angles and distances to two or more control points of known coordinates to fix the instrument's position. This total-station procedure is called

  1. backsight orientation on a known station
  2. resection (free-station set-up)
  3. intersection (from two known stations)
  4. stake-out
Answer and working

B. resection (free-station set-up)

Resection computes the occupied station's coordinates (and orientation) from observations to known points, which lets the instrument be placed wherever it has a good view. Intersection fixes a distant point from two known stations; ordinary orientation requires the instrument to be on a known point.

Question 5 · medium

Which GNSS technique gives centimetre-level positions in real time for staking out a land-grading design?

  1. Autonomous single-receiver code positioning
  2. Code-based differential GPS (DGPS)
  3. Long static carrier-phase sessions, processed later against reference stations
  4. Real-time kinematic (RTK) with a base station or reference network
Answer and working

D. Real-time kinematic (RTK) with a base station or reference network

RTK uses carrier-phase corrections from a base or network sent by radio or internet, and resolves positions to a few centimetres in seconds. Autonomous positioning is metre-level; code DGPS is sub-metre to metre; static gives very high accuracy but only after processing, not in real time.

Question 6 · medium

A four-sided field has corner coordinates (E, N) in metres of A(0, 0), B(120, 10), C(140, 95) and D(30, 110). What is its area?

  1. 22550 m²
  2. 13200 m²
  3. 5638 m²
  4. 11275 m²
Answer and working

D. 11275 m²

Shoelace: ½|Σ(xi yi+1 − xi+1 yi)| = ½|(0×10 − 120×0) + (120×95 − 140×10) + (140×110 − 30×95) + (30×0 − 0×110)| = ½|0 + 10,000 + 12,550 + 0| = 11275 m² (1.1275 ha). Forgetting the half doubles the answer; halving twice gives 5638 m²; 120 × 110 treats the field as a rectangle. 22550 m² forgets the half; 13200 m² is 120 × 110.

Question 7 · hard

A borrow pit is laid out as four 10 m × 10 m squares (a 2 × 2 grid). Depths of cut at the four outer corners are 1.2, 0.8, 1.0 and 1.4 m; at the four mid-side points 1.1, 0.9, 1.3 and 1.2 m; and at the centre point 1.05 m. What is the volume of excavation?

  1. 442.2 m³
  2. 248.8 m³
  3. 440.0 m³
  4. 1760.0 m³
Answer and working

C. 440.0 m³

V = (A/4)(Σh1 + 2Σh2 + 4Σh4) with A = 100 m²: Σh1 = 4.4, Σh2 = 4.5, h4 = 1.05. V = 25(4.4 + 9.0 + 4.2) = 440.0 m³. Averaging all nine depths over 400 m² (442.2 m³) ignores how many squares share each corner. 248.8 m³ applies A/4 without the 2 and 4 weights; 1760.0 m³ uses A = 400 m² instead of 100 m².

Question 8 · hard

A land-grading design gives total cut 1450 m³ and total fill 1320 m³. The engineer wants a cut:fill ratio of about 1.3 for this soil. What should be done?

  1. Increase the grid spacing
  2. Raise the design plane slightly
  3. Accept it: the current cut:fill ratio is already about 1.3, so no change is needed
  4. Lower the design plane slightly and recompute until cut/fill reaches about 1.3
Answer and working

D. Lower the design plane slightly and recompute until cut/fill reaches about 1.3

Current ratio = 1450/1320 = 1.10, below the target. Lowering the plane increases every cut and reduces every fill, raising the ratio; raising it would lower the ratio. The ratio allows for settlement and losses and its value depends on soil and conditions.

Question 9 · hard

The whole-circle bearings of lines AB and AC are 38°45′ and 301°30′. What is the angle BAC (the smaller angle between the two lines)?

  1. 97°15′
  2. 262°45′
  3. 340°15′
  4. 82°45′
Answer and working

A. 97°15′

Difference = 301°30′ − 38°45′ = 262°45′; the smaller angle between the lines is 360° − 262°45′ = 97°15′. 262°45′ is the reflex angle.

Question 10 · medium

For a topographic survey for land grading, when is a total station preferred over RTK GNSS?

  1. Always, because GNSS cannot measure heights
  2. On open fields with clear sky
  3. Where tree cover, buildings or steep banks block satellite signals
  4. When a reference network is available
Answer and working

C. Where tree cover, buildings or steep banks block satellite signals

RTK needs a clear view of enough satellites and a correction link; under canopy or beside tall obstructions it may fail or give poor fixes, and a total station works by line of sight to a prism. On open fields RTK is usually faster. GNSS does give heights, but ellipsoidal ones.

A study plan for Surveying & Levelling in NCEES PE Agricultural and Biological Engineering

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (60% of the 20 questions): GPS/GNSS surveying (5, 25%); Total station (5, 25%); Computation of area: trapezoidal and Simpson's rules (2, 10%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Earthwork volume computation (2, 10%); Levelling: rise-and-fall and height-of-instrument methods (2, 10%); Chain and tape surveying, including tape corrections (1, 5%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Compass traversing and bearings (1, 5%); Contouring (1, 5%); Land grading and levelling design (1, 5%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Levelling: rise-and-fall and height-of-instrument methods (2 hard of 2), Compass traversing and bearings (1 hard of 1), Land grading and levelling design (1 hard of 1).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — NCEES PE Agricultural and Biological Engineering Surveying & Levelling

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.