NCEES PE Agricultural and Biological Engineering Engineering Economics, Project & Business Management: practice questions

NCEES PE Agricultural and Biological Engineering · USA · NCEES (ASABE is the content partner)

Original practice questions written to the published syllabus · not past papers
10worked here, free
29written to this exam in this subject
9syllabus units

About NCEES PE Agricultural and Biological Engineering

NCEES PE Agricultural and Biological Engineering is a licensing and registration exam run by NCEES (ASABE is the content partner), for candidates in USA. Computer-based, 85 questions, 9.5-hour appointment (8.5 hours of exam). Once a year (next: 28 Oct 2026). Closed book with the electronic NCEES handbook and supplied searchable ASABE standards; SI and US customary units.

Source: ncees.org.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Engineering Economics, Project & Business Management in NCEES PE Agricultural and Biological Engineering

Money and time in engineering decisions: discounting, costs, break-even, project appraisal, scheduling and starting a business.

Our 29 NCEES PE Agricultural and Biological Engineering questions in this subject: 2 easy, 15 medium, 12 hard, across 9 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to NCEES PE Agricultural and Biological Engineering and are not shown on any other exam's page.

Question 1 · hard

Repair cost of a harvester is 5,000 in year 1 and rises by 1,000 each year, to 12,000 in year 8. At 10 % a year, what is the present worth of the 8 years of repair cost?

  1. 26,675
  2. 68,000
  3. 48,038
  4. 42,703
Answer and working

D. 42,703

Split into a base series and a gradient: P = 5,000(P/A, 10 %, 8) + 1,000(P/G, 10 %, 8) = 5,000 × 5.3349 + 1,000 × 16.0287 = 42,703. 26,675 ignores the gradient; 68,000 is the undiscounted total; 48,038 takes the base as 6,000, the common slip of starting the gradient in year 1 instead of year 2.

Question 2 · medium

A project's benefits are forecast in constant prices of the base year. At which rate should they be discounted?

  1. At the market interest rate, because that is the rate lenders actually charge the project
  2. At the inflation rate alone, because constant-price flows change only with general inflation
  3. At the real interest rate, which excludes inflation just as constant-price cash flows do
  4. At the market rate plus the inflation rate, to allow for inflation over the whole project life
Answer and working

C. At the real interest rate, which excludes inflation just as constant-price cash flows do

The rule is consistency: constant (real) cash flows at the real rate, actual (then-current) cash flows at the market rate, which already contains inflation. Discounting constant-price benefits at the market rate removes inflation twice and understates worth; adding inflation to the market rate makes the error worse.

Question 3 · medium

A public irrigation scheme has present worth of benefits 5.2 million, first cost 3.0 million and present worth of operation and maintenance cost 1.0 million. Using the modified benefit-cost ratio, in which O&M cost is deducted from benefits, what is the ratio?

  1. 1.30
  2. 1.73
  3. 1.40
  4. 1.05
Answer and working

C. 1.40

Modified B/C = (benefits − O&M)/first cost = (5.2 − 1.0)/3.0 = 1.40. 1.30 is the conventional ratio, benefits/(first cost + O&M) = 5.2/4.0; 1.73 omits O&M entirely; 1.05 counts O&M on both sides, (5.2 − 1.0)/(3.0 + 1.0). Both correct forms agree that B/C > 1, so the scheme is acceptable.

Question 4 · hard

Two mutually exclusive watershed projects have present worths of benefits and costs of 400 and 300 (project P) and 650 and 500 (project Q), in millions. Which should be chosen by incremental benefit-cost analysis?

  1. Q, because the increment of 250 in benefits over 200 in costs gives a ratio of 1.25
  2. P, because its benefit-cost ratio of 1.33 is higher than Q's ratio of 1.30
  3. Q, because it has the larger benefits, whatever the size of its extra costs
  4. P, because projects should be ranked by the smaller cost when both ratios exceed 1
Answer and working

A. Q, because the increment of 250 in benefits over 200 in costs gives a ratio of 1.25

Both pass individually (1.33 and 1.30). For mutually exclusive projects, compare the increment: ΔB/ΔC = (650 − 400)/(500 − 300) = 250/200 = 1.25 ≥ 1, so the extra spending is justified and Q is chosen. Q's NPV (150) also exceeds P's (100). Picking the higher ratio is the same error as picking the higher IRR.

Question 5 · medium

A combine harvester costs 2,400,000, has a salvage value of 400,000 and an expected life of 4,000 operating hours. It works 450 hours this year. What is this year's depreciation by the units-of-production method?

  1. 270,000
  2. 225,000
  3. 250,000
  4. 500,000
Answer and working

B. 225,000

D = (B − S) × hours this year / lifetime hours = 2,000,000 × 450/4,000 = 225,000. 270,000 ignores salvage; 250,000 and 500,000 are straight-line charges over 8 and 4 years, which ignore the actual use.

Question 6 · easy

A sprayer has an ownership cost of 100,000 a year. What happens to its ownership cost per hour if annual use rises from 200 to 400 hours?

  1. It doubles, from 250 to 500 per hour
  2. It halves, from 500 to 250 per hour
  3. It stays at 500 per hour, because the cost is fixed
  4. It falls by a quarter, from 500 to 375 per hour
Answer and working

B. It halves, from 500 to 250 per hour

Ownership cost is fixed per year, so the cost per hour is 100,000/200 = 500 at 200 h and 100,000/400 = 250 at 400 h. Operating cost per hour, by contrast, stays roughly constant with use. This is why high annual use, through custom hiring or sharing, makes ownership cheaper per unit.

Question 7 · medium

When estimating operator labour cost per hectare for a machine, why is the labour time usually taken as greater than the field time?

  1. Because labour is a fixed cost and must be charged for every hour of the year
  2. Because the operator is also paid for travel, servicing and set-up time outside the field
  3. Because field efficiency is applied twice, once to the machine and once to the operator
  4. Because operators work slower than the machine's rated speed in every operation
Answer and working

B. Because the operator is also paid for travel, servicing and set-up time outside the field

Field time counts only hours in the field; the operator is also paid while travelling, refuelling, greasing and hitching. ASABE practice therefore charges labour on a larger number of hours than machine field time. Labour paid by the hour remains a variable cost.

Question 8 · hard

A project has present worth of benefits 12.0 million and present worth of costs 10.0 million. By what percentage can benefits fall, all else unchanged, before NPV becomes zero?

  1. 20.0 %
  2. 83.3 %
  3. 16.7 %
  4. 2.0 %
Answer and working

C. 16.7 %

The switching value for benefits is NPV/PW benefits = 2.0/12.0 = 16.7 %. 20.0 % is the switching value for costs (2.0/10.0); 83.3 % is the share of benefits that remains; 2.0 % confuses the NPV in millions with a percentage.

Question 9 · hard

A 100 kg feed mix is made from x1 kg of maize (9 % crude protein) and x2 kg of soybean meal (44 % crude protein), with x1 + x2 = 100. Which constraint ensures at least 16 % crude protein in the mix?

  1. 0.09x1 + 0.44x2 ≥ 16
  2. 0.09x1 + 0.44x2 ≥ 0.16
  3. 9x1 + 44x2 ≥ 16
  4. x1 + x2 ≥ 16
Answer and working

A. 0.09x1 + 0.44x2 ≥ 16

Protein supplied in kg is 0.09x1 + 0.44x2, and 16 % of 100 kg is 16 kg, so the left and right sides are both in kilograms. Writing 0.16 mixes a fraction with kilograms; 9x1 + 44x2 mixes percentages with kilograms; x1 + x2 ≥ 16 says nothing about protein.

Question 10 · medium

On a Shewhart control chart for the mean weight of filled grain bags, where are the control limits normally placed?

  1. At the product's specification limits stated on the bag label
  2. Three standard deviations of the sample mean either side of the centre line
  3. Two standard deviations of individual bag weights either side of the target weight
  4. At the highest and lowest sample means recorded in the first week
Answer and working

B. Three standard deviations of the sample mean either side of the centre line

Shewhart limits are statistical, ±3σ of the plotted statistic, which for a mean chart is σ/√n. Specification limits describe what the customer requires and are a different concept; a process can be in control yet produce out-of-specification bags.

A study plan for Engineering Economics, Project & Business Management in NCEES PE Agricultural and Biological Engineering

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (62% of the 29 questions): Fixed and variable costs (9, 31%); Replacement analysis (6, 21%); NPV, IRR, benefit-cost ratio and payback (3, 10%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Time value of money (3, 10%); Break-even analysis (2, 7%); Depreciation methods (2, 7%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Project appraisal and detailed project reports (2, 7%); Entrepreneurship and marketing (1, 3%); Linear programming (1, 3%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Break-even analysis (2 hard of 2), Linear programming (1 hard of 1), NPV, IRR, benefit-cost ratio and payback (2 hard of 3).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Fixed and variable costs (2 easy of 9).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — NCEES PE Agricultural and Biological Engineering Engineering Economics, Project & Business

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.