Agricultural and Biosystems Engineers Licensure Examination (ABELE) · Philippines · Professional Regulatory Board of Agricultural and Biosystems Engineering, PRC
Original practice questions written to the published syllabus · not past papersAgricultural and Biosystems Engineers Licensure Examination (ABELE) is a licensing and registration exam run by Professional Regulatory Board of Agricultural and Biosystems Engineering, PRC, for candidates in Philippines. Paper-based, 2 days (Day 1 6 hours; Day 2 5 hours + 4 hours). Non-programmable calculator only; the Dec 2025 programme bans the Casio fx-991ES/ES Plus by name.
Source: prc.gov.ph.
Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.
Materials, structural members, foundations and estimates for farm buildings and small works.
Our 60 Agricultural and Biosystems Engineers Licensure Examination questions in this subject: 5 easy, 30 medium, 25 hard, across 9 units.
Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.
These 10 were written to Agricultural and Biosystems Engineers Licensure Examination and are not shown on any other exam's page.
Cracking of a ten-year-old concrete culvert is traced to an expansive gel formed inside some aggregate particles. What is the process?
D. Alkali–aggregate reaction between reactive silica in the aggregate and cement alkalis
Alkali–silica reaction forms a hygroscopic gel that swells and cracks concrete years later, often in a map pattern. Plastic shrinkage occurs within hours of casting; carbonation lowers the pH of the paste and leads to steel corrosion but does not form gel in the aggregate; freeze–thaw damages the paste.
A timber rafter 75 mm wide and 200 mm deep (on edge) spans 3 m simply supported and carries a uniform load of 2 kN/m. What is the maximum bending stress?
A. 4.50 MPa
M = wL²/8 = 2.0 × 3.0²/8 = 2.250 kN·m. Z = bd²/6 = 75 × 200²/6 = 500,000 mm³. σ = M/Z = 2,250,000/500,000 = 4.50 MPa. Laying the rafter flat (Z = db²/6) gives 12.00 MPa; using wL²/12 (fixed ends) gives 3.00 MPa; treating the total load as a central point load gives 9.00 MPa.
A beam 300 mm wide with effective depth 500 mm has four 16 mm Fe500 bars in tension and M25 concrete. Using IS 456, what is its moment of resistance?
B. 155.9 kN·m
Ast = 4 × π × 16²/4 = 804.2 mm². xu = 0.87 × 500 × 804.2/(0.36 × 25 × 300) = 129.6 mm < xu,max = 0.46 × 500 = 230 mm, so the section is under-reinforced. Mu = 0.87 fy Ast (d − 0.42 xu) = 155.9 kN·m. Ignoring the lever-arm reduction gives 174.9; dropping 0.87 gives 175.9; 250.5 is Mu,lim, the capacity only if the section were reinforced up to the limit.
What minimum reinforcement does IS 456 require in each direction of a 150 mm thick slab reinforced with high-strength deformed bars, per metre width?
A. 180 mm²
Minimum = 0.12% of the gross area = 0.0012 × 1000 × 150 = 180 mm²/m. 225 mm² applies the 0.15% rule meant for mild steel; 150 mm² uses an effective depth of 125 mm instead of the full thickness; 1,800 mm² is a decimal-point slip (1.2% instead of 0.12%).
Under ACI 318, a tension-controlled rectangular beam has b = 250 mm, d = 450 mm, As = 1,200 mm², fy = 420 MPa and f′c = 28 MPa. What is the design flexural strength φMn (φ = 0.9)?
B. 184.9 kN·m
a = As fy/(0.85 f′c b) = 1200 × 420/(0.85 × 28 × 250) = 84.7 mm. Mn = As fy (d − a/2) = 1200 × 420 × (450 − 42.4) = 205.5 kN·m. φMn = 0.9 × 205.5 = 184.9 kN·m. 205.5 omits φ; 165.7 uses d − a instead of d − a/2; 204.1 ignores the stress block. (c = a/0.85 = 100 mm, c/d = 0.22, so the section is tension-controlled.)
Why is differential settlement more damaging to a building than uniform settlement of the same maximum magnitude?
C. It distorts the building, causing cracks, tilt and jammed doors; uniform settlement does not
Angular distortion between adjacent supports induces stresses and cracks in walls and frames; a building that settles uniformly may only need service connections adjusted. Both kinds can be immediate or time-dependent.
One cubic metre of brickwork uses 500 bricks of actual size 190 × 90 × 90 mm. If dry mortar volume is taken as 1.27 times the wet volume of joints, what dry mortar volume is needed (ignoring frog filling and wastage)?
A. 0.293 m³
Volume of bricks = 500 × 0.19 × 0.09 × 0.09 = 0.7695 m³; wet mortar = 1 − 0.7695 = 0.2305 m³; dry = 0.2305 × 1.27 = 0.293 m³. 0.231 is the wet volume; 0.769 is the brick volume; 0.355 uses the concrete dry-volume factor.
A rectangular building has outer-wall centre lines of 10 m and 6 m, and one cross wall with a centre-line length of 6 m joining the two long walls. The foundation trench is 0.8 m wide and 0.9 m deep throughout. By the centre-line method, what is the earthwork in excavation?
D. 26.78 m³
Total centre line = 2(10 + 6) + (6 − 2 × 0.4) = 32 + 5.2 = 37.2 m (half the trench width is deducted at each of the two junctions). Earthwork = 37.2 × 0.8 × 0.9 = 26.78 m³. No deduction gives 27.36; deducting the full width at both ends gives 26.21; deducting half width at one end only gives 27.07.
A godown cost 800,000 currency units, has a scrap value of 80,000 and a useful life of 40 years. By the straight-line method, what is its book value after 15 years?
B. 530,000
Annual depreciation = (800,000 − 80,000)/40 = 18,000. After 15 years: 800,000 − 15 × 18,000 = 530,000. 500,000 ignores the scrap value; 270,000 is the accumulated depreciation, not the book value. 610,000 adds the scrap value on top of the book value.
What are liquidated damages in a construction contract?
B. A pre-agreed sum per day or week of delay, payable by the contractor for late completion
Liquidated damages are a genuine pre-estimate of loss, written into the contract so that the owner does not need to prove actual loss. Delays caused by the owner entitle the contractor to an extension of time, not to pay damages. Defective work is handled by rectification and the defects liability period.
This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.
Read the manual chapters for these first and do every worked question you can find on them.
Aim for one sitting per unit, then mixed questions across them.
Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.
Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.
Do these early in revision so they are fast on the day.
Last updated · How Laisha writes and checks its pages · Report a mistake
US$10 a month · one price worldwide · cancel any time
| Free | Smarter | |
|---|---|---|
| Grow guides, pest pages, articles | Read all | Read all |
| Ask Laisha | 5 a day | Up to 1,000 a month |
| Exam practice | The sample on each page | Every question, timed papers |
| Crop calendar and pest alerts | — | For your own fields |
| Calculators and tools | — | All |
| Uploads and reports | — | 100 a month, real files |