ASRB NET — Farm Machinery & Power / Land & Water Management Engineering / Agricultural Structures & Process Engineering · India · Agricultural Scientists Recruitment Board (ICAR)
Original practice questions written to the published syllabus · not past papersASRB NET — Farm Machinery & Power / Land & Water Management Engineering / Agricultural Structures & Process Engineering is a specialist certification exam run by Agricultural Scientists Recruitment Board (ICAR), for candidates in India. NET: 150 MCQs, 150 marks, 2 hours, −1/3 per wrong answer, English/Hindi, PG level. Combined NET/ARS/SMS/STO recruitment runs prelims, mains and interview.
Official site: pw.live.
We have not been able to confirm these details against the exam body's own specification, so fees, dates and pass marks are left out on purpose. Check the current format, eligibility, fees and dates on the official site.
Watershed management concepts and standard formulas, programme guidelines and evaluation, at the depth of an M.Tech course.
Planning a whole watershed: delineating it, classifying its land, budgeting its water and choosing harvesting structures with the people who live there.
Our 38 ASRB NET questions in this subject: 1 easy, 19 medium, 18 hard, across 10 units.
Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.
These 10 were written to ASRB NET and are not shown on any other exam's page.
When deriving a stream network from a DEM, lowering the flow-accumulation threshold used to define streams will:
D. denser network and higher drainage density
A lower threshold means fewer upstream cells are needed before a cell is called a stream, so more small channels appear and total stream length per unit area rises. This is why drainage densities from DEMs should only be compared when the same threshold and resolution were used. The boundary itself depends on the pour point, not the threshold.
In the FAO Framework for Land Evaluation, class N1 means land that is:
C. currently not suitable, although the limitation may be overcome in future
FAO suitability classes are S1 (highly), S2 (moderately), S3 (marginally suitable), N1 (currently not suitable; limitations may be overcome later, for example at higher cost) and N2 (permanently not suitable). Suitability is always judged for a defined land utilisation type, not for all uses.
The land capability classification of Klingebiel and Montgomery assumes which of the following?
B. Moderately high management
LCC interprets physical limitations under a moderately high level of management; it deliberately ignores location, markets, ownership and crop value. Reclamation (drainage, removal of stones) can change the effective class, so land is not assumed to be unchangeable.
What distinguishes the USBR irrigation land classification from a purely physical soil classification?
A. Classes are defined by capacity to repay the costs of irrigation development, so economics is built in
The USBR system groups land by payment capacity: its ability to sustain enough net farm income under irrigation to cover costs. Drainage, topography and soil are all assessed, but interpreted in economic terms.
At Sukhomajri in Haryana, a feature that made the community's grazing closure of the catchment work was:
D. water from the new dam was shared among all households, including the landless, who could trade shares
The families who gave up grazing in the catchment, including landless households, received a share of the stored water that they could use or sell, so they had a direct interest in protecting the catchment. Rules were set and enforced by the village society, not by fencing or orders.
The correct basis for measuring the benefit of a watershed project in cost-benefit analysis is the comparison:
B. with the project versus without the project
Many things change over time regardless of the project: rainfall, prices, varieties. Only the difference between the situation with the project and the situation that would have existed without it is attributable to the project. A before–after comparison credits the project with changes it did not cause.
In the economic (as opposed to financial) analysis of a watershed project, which adjustment is made?
C. Transfer payments such as taxes and subsidies are removed and distorted prices are replaced by shadow prices
Economic analysis takes society's viewpoint: taxes and subsidies transfer money within society and are not real costs or benefits, and inputs like unskilled labour are valued at their opportunity cost (shadow price). Financial analysis, from the farmer's or agency's viewpoint, uses market prices including transfers.
Two mutually exclusive watershed designs are compared at the same discount rate: Design P has NPV 8 million and BCR 1.4; Design Q has NPV 5 million and BCR 1.9. Budget is not a constraint. Which should be chosen, and why?
D. Design P, because among mutually exclusive projects the one with the higher NPV adds more net value
BCR and NPV can rank projects of different sizes differently. When only one can be built and capital is not constrained, the higher NPV gives the greatest net benefit to society. BCR is a ratio and favours smaller projects with high returns per unit cost, which matters mainly when budgets are rationed.
The US Soil Conservation Service, created in 1935 after the Dust Bowl, is now called:
B. the Natural Resources Conservation Service
The Soil Conservation Service was renamed the Natural Resources Conservation Service (NRCS) in 1994. The Bureau of Reclamation builds western irrigation and water projects; the EPA and Forest Service are separate agencies.
A common lesson from watershed programmes in India, Ethiopia, Kenya and China is that works on common land and upper slopes last longest when:
D. users hold secure, agreed rights to benefits such as fodder, water or tree produce and help set the rules
Evaluations across countries find that maintenance and protection depend on who benefits: when users gain fodder, water or produce and help make and enforce rules, closures and structures survive. High engineering standard alone does not ensure maintenance, and permanent bans imposed from outside are hard to enforce.
This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.
Read the manual chapters for these first and do every worked question you can find on them.
Aim for one sitting per unit, then mixed questions across them.
Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.
Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.
Do these early in revision so they are fast on the day.
Last updated · How Laisha writes and checks its pages · Report a mistake
US$10 a month · one price worldwide · cancel any time
| Free | Smarter | |
|---|---|---|
| Grow guides, pest pages, articles | Read all | Read all |
| Ask Laisha | 5 a day | Up to 1,000 a month |
| Exam practice | The sample on each page | Every question, timed papers |
| Crop calendar and pest alerts | — | For your own fields |
| Calculators and tools | — | All |
| Uploads and reports | — | 100 a month, real files |
An AI operating system for agriculture: free guides, manuals and tools written for every country.