LAISHA
Open Laisha

ICAR AICE-JRF/SRF Bio-energy Systems: Design & Applications: practice questions

ICAR AICE-JRF/SRF (PhD) — Agricultural Engineering subjects 38–43 · India · National Testing Agency for ICAR

Original practice questions written to the published syllabus · not past papers
10worked here, free
90written to this exam in this subject
13syllabus units

About ICAR AICE-JRF/SRF

ICAR AICE-JRF/SRF (PhD) — Agricultural Engineering subjects 38–43 is a PhD, fellowship and lectureship exam run by National Testing Agency for ICAR, for candidates in India. LAN-based computer test, 2 hours, 120 MCQs: 20 Part A (general knowledge and reasoning), 50 Part B (core group), 50 Part C (specialisation); four options.

Source: icar.org.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Bio-energy Systems: Design & Applications in ICAR AICE-JRF/SRF

PG-depth questions on biomass chemistry and thermal decomposition, gasification reactions and equilibrium trends, equivalence ratio effects, reactor sizing, Buswell stoichiometry and COD-based methane yield, digestion kinetics, cellulosic ethanol pretreatment and SSF, transesterification chemistry and FFA handling, and energy-in-agriculture indicators.

Turning crop residues, dung and oils into fuel: briquettes, gasifiers, biogas plants and liquid biofuels, and auditing farm energy.

Our 90 ICAR AICE-JRF/SRF questions in this subject: 1 easy, 60 medium, 29 hard, across 13 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to ICAR AICE-JRF/SRF and are not shown on any other exam's page.

Question 1 · medium

A sample of crop residue has, on an as-received basis, moisture 12%, volatile matter 62% and ash 8%. Its ash content on a dry basis is closest to:

  1. 8.00%
  2. 10.00%
  3. 9.09%
  4. 8.96%
Answer and working

C. 9.09%

Dry-basis value = as-received value ÷ (1 − moisture fraction) = 8 ÷ (1 − 0.12) = 9.09%. Leaving the 8% unchanged ignores the basis; dividing by (1 − moisture − ash) = 0.80 (10.00%) is the dry ash-free conversion, which cannot be applied to ash itself. Multiplying by (1 + M), 8 × 1.12 = 8.96%, is a common but wrong shortcut.

Question 2 · medium

A dry biomass has a higher heating value of 18.5 MJ/kg and contains 6% hydrogen (dry basis). Taking the latent heat of water as 2.442 MJ/kg, its lower heating value (dry basis) is:

  1. 18.35 MJ/kg
  2. 8.51 MJ/kg
  3. 19.82 MJ/kg
  4. 17.18 MJ/kg
Answer and working

D. 17.18 MJ/kg

Water formed = 9 × H = 9 × 0.06 = 0.54 kg per kg fuel. LHV = HHV − 2.442 × 0.54 = 18.5 − 1.32 = 17.18 MJ/kg. Forgetting the factor 9 (1 kg H2 forms 9 kg H2O) gives 18.35 MJ/kg; adding instead of subtracting (19.82 MJ/kg) reverses the definition; 8.51 MJ/kg multiplies the HHV by (1 − 9H) = 0.46 instead of subtracting the latent heat.

Question 3 · medium

A fast-pyrolysis unit converts dry biomass (HHV 19 MJ/kg) to bio-oil at a yield of 65% by mass; the bio-oil HHV is 17 MJ/kg. The fraction of feed energy recovered in the bio-oil is:

  1. 65.0%
  2. 58.2%
  3. 72.6%
  4. 89.5%
Answer and working

B. 58.2%

Energy recovery = 0.65 × 17 ÷ 19 = 58.2%. Bio-oil has a lower HHV than the dry feed largely because it carries 15–30% water and is rich in oxygen, so energy recovery is below the mass yield. 65.0% is the mass yield; 72.6% inverts the heating-value ratio (0.65 × 19 ÷ 17); 89.5% is the heating-value ratio alone (17 ÷ 19).

Question 4 · medium

A downdraft gasifier consumes 50 kg/h of wood chips and 75 kg/h of air. The stoichiometric air–fuel ratio of the wood is 6 kg/kg. The equivalence ratio is:

  1. 4.00
  2. 0.25
  3. 1.50
  4. 0.67
Answer and working

B. 0.25

Actual A/F = 75 ÷ 50 = 1.50 kg/kg. ER = actual ÷ stoichiometric = 1.50 ÷ 6 = 0.25, within the usual gasification range of about 0.2–0.4. 1.50 is the actual air–fuel ratio, not the ER; 4.00 is its inverse. 0.67 is the fuel–air ratio (50 ÷ 75).

Question 5 · hard

A producer gas of LHV 5.18 MJ/Nm³ needs 1.10 Nm³ of air per Nm³ for stoichiometric combustion. The energy content of the stoichiometric gas–air mixture, and the main consequence for an engine converted from petrol (whose stoichiometric mixture holds roughly 3.5–3.8 MJ/m³), are:

  1. 5.18 MJ/m³ of mixture; no derating because the gas LHV is unchanged
  2. 5.68 MJ/m³ of mixture; the engine gains power
  3. 2.47 MJ/m³ of mixture; the engine gains power because of the gas's high flame speed
  4. 2.47 MJ/m³ of mixture; the engine is derated because each cylinder charge holds less energy
Answer and working

D. 2.47 MJ/m³ of mixture; the engine is derated because each cylinder charge holds less energy

Mixture energy = gas LHV ÷ (1 + air/gas) = 5.18 ÷ (1 + 1.10) = 2.47 MJ/m³. A cylinder fills with mixture, not with gas, so the energy per stroke is roughly 65–71% of that on petrol (2.47 ÷ 3.8 to 2.47 ÷ 3.5) before efficiency effects. Producer-gas engines are therefore derated unless compression ratio or turbocharging compensates; the high knock resistance of CO and CH4 permits a higher compression ratio.

Question 6 · medium

Biogas that is to be compressed and used as a vehicle fuel must first be upgraded, which mainly means:

  1. Adding air to raise its oxygen content
  2. Removing CO2 and impurities
  3. Heating it to crack most of the methane into hydrogen (H2), which has a higher energy per cubic metre
  4. Adding nitrogen to lower its flame speed
Answer and working

B. Removing CO2 and impurities

Raw biogas is about 50–70% CH4 with 30–50% CO2, traces of H2S and saturation water. Upgrading by water scrubbing, pressure-swing adsorption, membranes or chemical absorption removes CO2 and impurities to give biomethane with over about 90–97% methane, depending on the specification. H2S must also be removed because it is toxic and corrosive.

Question 7 · medium

For a family biogas plant, the hydraulic retention time chosen at the design stage should be:

  1. Longer in cold climates and seasons, because gas production per day falls as temperature drops
  2. The same everywhere, because it depends only on the feed
  3. Shorter in cold climates to keep the slurry warm
  4. Less than 5 days, to prevent washout of methanogens
Answer and working

A. Longer in cold climates and seasons, because gas production per day falls as temperature drops

Microbial activity slows sharply with temperature, so unheated plants in cooler regions need longer HRT (bigger digesters) for the same degradation. National programmes therefore specify longer HRTs for hill and cold regions than for warm plains. Very short HRTs risk washout of slow-growing methanogens, which is the opposite problem.

Question 8 · medium

A distillery ferments 1 t of molasses containing 45% fermentable sugars (expressed as glucose). With 0.511 kg ethanol per kg glucose theoretically and a fermentation efficiency of 90%, the ethanol produced (density 0.789 kg/L) is about:

  1. 292 L
  2. 263 L
  3. 207 L
  4. 583 L
Answer and working

B. 263 L

Sugar = 1000 × 0.45 = 450 kg. Ethanol = 450 × 0.5114 × 0.9 = 207.1 kg = 207.1 ÷ 0.789 = 263 L. 207 is the mass in kg; applying the yield to the whole molasses mass ignores its water and non-fermentable solids. Distillation losses reduce the product further. 292 L ignores the 90% fermentation efficiency (230.1 ÷ 0.789).

Question 9 · hard

Simultaneous saccharification and fermentation (SSF) improves cellulosic ethanol processes mainly because:

  1. It eliminates the need for any pretreatment
  2. It allows fermentation at 90 °C, where the cellulase enzymes and the yeast are both fastest
  3. It converts lignin to ethanol
  4. Yeast consumes glucose as soon as it is released, relieving cellulase product inhibition
Answer and working

D. Yeast consumes glucose as soon as it is released, relieving cellulase product inhibition

Cellulases are inhibited by their products, cellobiose and glucose. In SSF, hydrolysis and fermentation share one vessel, so glucose is kept low and hydrolysis proceeds further. The compromise is temperature: enzymes prefer about 45–50 °C and yeast about 30–35 °C. Pretreatment is still needed, and lignin is not fermentable.

Question 10 · easy

A wheat crop has a total energy input of 15000 MJ/ha and an energy output (grain + straw) of 90000 MJ/ha. The energy ratio and the net energy are:

  1. 0.17 and 75000 MJ/ha
  2. 6.0 and 105000 MJ/ha
  3. 600 and -75000 MJ/ha
  4. 6.0 and 75000 MJ/ha
Answer and working

D. 6.0 and 75000 MJ/ha

Energy ratio = 90000 ÷ 15000 = 6.0. Net energy = 90000 − 15000 = 75000 MJ/ha. The inverse (0.17) is input per unit output.

A study plan for Bio-energy Systems: Design & Applications in ICAR AICE-JRF/SRF

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (49% of the 90 questions): Bio-ethanol (9, 10%); Biodiesel and transesterification (9, 10%); Energy audit and energy ratio in agriculture (9, 10%); Gasification: updraft and downdraft gasifiers (9, 10%); Anaerobic digestion stages (8, 9%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Biogas plant sizing and gas yield (7, 8%); Biomass characterisation: proximate and ultimate analysis (7, 8%); Calorific value (6, 7%); Producer gas and dual-fuel engines (6, 7%); Pyrolysis (6, 7%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Biogas plant types: floating drum and fixed dome (5, 6%); Combustion of biomass (5, 6%); Briquetting and pelleting (4, 4%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Biogas plant sizing and gas yield (4 hard of 7), Calorific value (3 hard of 6), Combustion of biomass (2 hard of 5).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Energy audit and energy ratio in agriculture (1 easy of 9).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — ICAR AICE-JRF/SRF Bio-energy Systems: Design & Applications

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.