LAISHA
Open Laisha

ICAR AICE-JRF/SRF Precision Agriculture & System Management: practice questions

ICAR AICE-JRF/SRF (PhD) — Agricultural Engineering subjects 38–43 · India · National Testing Agency for ICAR

Original practice questions written to the published syllabus · not past papers
10worked here, free
71written to this exam in this subject
10syllabus units

About ICAR AICE-JRF/SRF

ICAR AICE-JRF/SRF (PhD) — Agricultural Engineering subjects 38–43 is a PhD, fellowship and lectureship exam run by National Testing Agency for ICAR, for candidates in India. LAN-based computer test, 2 hours, 120 MCQs: 20 Part A (general knowledge and reasoning), 50 Part B (core group), 50 Part C (specialisation); four options.

Source: icar.org.in.

Checked against the exam body's published information. Formats and fees change; confirm the current edition there before you book.

Precision Agriculture & System Management in ICAR AICE-JRF/SRF

Definitions and components of precision agriculture; GNSS principles and accuracy classes; vegetation indices, especially NDVI; variable-rate irrigation and fertigation; soil sensing and management zones; recall of standards such as ISO 11783.

Using positioning, sensing and variable-rate control to manage fields by the metre instead of by the hectare.

Our 71 ICAR AICE-JRF/SRF questions in this subject: 24 easy, 30 medium, 17 hard, across 10 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to ICAR AICE-JRF/SRF and are not shown on any other exam's page.

Question 1 · easy

Which of these is a regional satellite navigation system rather than a global one?

  1. Galileo
  2. GLONASS
  3. BeiDou
  4. NavIC
Answer and working

D. NavIC

NavIC (IRNSS) covers India and the surrounding region. GPS, GLONASS, Galileo and BeiDou are the four global constellations.

Question 2 · medium

A GNSS receiver has a user equivalent range error of 5 m and the horizontal dilution of precision is 1.2. The expected horizontal position error is about

  1. 4.2 m
  2. 6.2 m
  3. 0.24 m
  4. 6.0 m
Answer and working

D. 6.0 m

Position error ≈ UERE × DOP = 5 × 1.2 = 6.0 m. Dividing (5/1.2 = 4.2 m) or adding (5 + 1.2 = 6.2 m) are the usual slips, and 0.24 m inverts the ratio (1.2/5); DOP multiplies the range error.

Question 3 · easy

What distinguishes real-time kinematic (RTK) positioning from ordinary code-based GNSS?

  1. It averages many code pseudoranges over a long time from a single receiver
  2. It uses geostationary satellites to broadcast wide-area ionospheric corrections
  3. It resolves carrier-phase ambiguities using data from a nearby base station
  4. It measures the Doppler shift of the signal to compute a speed-corrected position
Answer and working

C. It resolves carrier-phase ambiguities using data from a nearby base station

RTK uses the carrier phase and corrections from a base at a known point to fix integer ambiguities, giving about 1–2.5 cm. Wide-area geostationary corrections describe SBAS, which gives sub-metre accuracy; averaging code ranges or using Doppler does not reach centimetre level.

Question 4 · medium

A semivariogram of soil P has a range of 120 m. A common rule of thumb gives a maximum grid sampling interval of about

  1. 60 m
  2. 120 m
  3. 240 m
  4. 30 m
Answer and working

A. 60 m

Sampling at less than half the range keeps neighbours correlated: 120 / 2 = 60 m. Sampling at the range (120 m) or twice it (240 m) leaves points uncorrelated; 30 m is safe but not the maximum.

Question 5 · hard

When choosing the number of management zones with fuzzy c-means, the fuzziness performance index (FPI) and normalised classification entropy (NCE) are used. Which number is preferred?

  1. The number at which both indices are at or near their maximum
  2. The largest number the terminal can store, to keep all detail
  3. The number at which both indices are at or near their minimum
  4. The number equal to the years of yield data available
Answer and working

C. The number at which both indices are at or near their minimum

Low FPI and NCE mean less membership sharing and more distinct classes, so the minimum indicates the best number, moderated by practical judgement (typically 2–5 zones). More zones are not better if they cannot be managed.

Question 6 · easy

A canopy has NIR reflectance 0.50 and red reflectance 0.08. Its NDVI is about

  1. 0.72
  2. 0.42
  3. 6.25
  4. 0.84
Answer and working

A. 0.72

NDVI = (0.50 − 0.08)/(0.50 + 0.08) = 0.42/0.58 = 0.72. 0.42 forgets the denominator; 6.25 is the simple ratio NIR/red; 0.84 is 0.42/0.50.

Question 7 · medium

Which part of ISO 11783 defines the virtual terminal, which lets one cab display operate implements from different makers?

  1. Part 6
  2. Part 10
  3. Part 9
  4. Part 2
Answer and working

A. Part 6

Part 6 is the virtual terminal. Part 10 is the task controller, Part 9 the tractor ECU and Part 2 the physical layer.

Question 8 · hard

An ISOBUS message longer than 8 data bytes is sent using the transport protocol. The largest message this protocol can carry is

  1. 2040 bytes
  2. 255 bytes
  3. 1792 bytes
  4. 1785 bytes
Answer and working

D. 1785 bytes

The transport protocol splits data into packets of 7 bytes with a maximum of 255 packets: 255 × 7 = 1785 bytes. 2040 uses 8 bytes per packet; 255 is the packet count; larger transfers use the extended transport protocol. 1792 bytes uses 256 packets instead of 255.

Question 9 · hard

At 250 kbit/s, the duration of one bit on the ISOBUS network is

  1. 0.4 µs
  2. 40 µs
  3. 250 µs
  4. 4 µs
Answer and working

D. 4 µs

Bit time = 1 / 250,000 s = 4 × 10⁻⁶ s = 4 µs. 0.4 and 40 µs are decimal slips; 250 µs confuses rate with time.

Question 10 · medium

Which decision-support function is commonly built into a modern FMIS?

  1. Setting the CAN bit rate of the implement bus
  2. Irrigation scheduling from a soil-water balance
  3. Replacing the GNSS receiver's firmware each season
  4. Designing the combine's clean-grain elevator
Answer and working

B. Irrigation scheduling from a soil-water balance

FMIS decision-support modules include irrigation scheduling, disease-risk forecasts and crop models. Bus settings, firmware and machine design are not FMIS functions.

A study plan for Precision Agriculture & System Management in ICAR AICE-JRF/SRF

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (59% of the 71 questions): GNSS and RTK positioning (13, 18%); Proximal and remote sensing for crops (12, 17%); Prescription maps (10, 14%); Variable-rate technology (7, 10%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Yield monitoring (7, 10%); Farm management information systems (6, 8%); ISOBUS basics (6, 8%); Auto-steer and guidance (4, 6%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Farm data management (4, 6%); Section control (2, 3%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Section control (1 hard of 2), ISOBUS basics (2 hard of 6), Variable-rate technology (2 hard of 7).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Farm management information systems (3 easy of 6); Auto-steer and guidance (2 easy of 4).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — ICAR AICE-JRF/SRF Precision Agriculture & System Management

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.